Laserfiche WebLink
ROOF NOTES <br /> 1.ROOF MATERIAL SHALL BE METAL ROOFING OVER ONE LAYER 30#ASPHALT <br /> FELT PAPER AND SOLID ROOF SHEATHING.(REFERENCE STRUCT.FOR <br /> SHEATHING INFORMATION)THE ROOF SHALL CONFORM TO THE i ,J <br /> REQUIREMENTS OF A CLASS"C"OR BETTER ROOFING ASSEMBLY.2.ROOF PITCH SHALL BE 4:12,OR UNLESS NOTED OTHERWISE ON ROOF PLAN. <br /> 3.ROOF OVERHANGS SHALL BE AS DIMENSIONED ON ROOF PLAN. <br /> 4.ALL VENT PIPES AND CAPS SHALL BE PAINTED TO MATCH COLOR OF ROOF G p <br /> MATERIAL AND SHALL BE HIDDEN BEHIND RIDGES WHERE POSSIBLE. J 0 W <br /> m <br /> 5.PROVIDE ATTIC VENTILATION @ 1 SQ.FT.PER 150 SQ.FT.OF ATTIC AREA BY J Q <br /> MEANS OF EQUALLY SPACED EAVE VENTS WITH 1/4"X 1/4"GALVANIZED MESH Lu 3 2 <br /> SCREEN AND PREFABRICATED GABLE END ATTIC VENTS AS INDICATED ON W z m <br /> EXTERIOR ELEVATIONS. F G N m <br /> VENT CALCS ° W"^ <br /> VENTING REQUIRED:1/150 w D 10' <br /> a uga <br /> maz <br /> 1.ROOF wi W <br /> ATTIC SF:1,338SF1150SF=8.9SF w a Q a m <br /> EAVE VENT=44 BLOKCS 0 0.204 SF=9.OSF z f <br /> RIDGE VENT-47'@ 0.083SF/LF-3.9SF c F a <br /> TOTAL VENTING PROVIDED=12.9SF>8.9SF,OKAY ti w 2 Q W m <br /> O EU <br /> O N f a <br /> Nm <br /> O <br /> ND3 <br /> Q y <br /> F� <br /> =G'2 <br /> Y� <br /> a� <br /> OO <br /> Fy�y <br /> OZ <br /> Op <br /> Ww <br /> 2 <br /> DO <br /> A4.1 0O <br /> Y F- <br /> 3 3s <br /> 0 <br /> r� <br /> WO <br /> W <br /> Qi <br /> 0 <br /> ———————————— ————————— <br /> r <br /> F <br /> I O� <br /> Ih I a u <br /> P NEW 2X4 I a <br /> SKYLIGHTS, I o <br /> TYP. 0� <br /> � ro <br /> W <br /> DN:SLOPE 9:12 I �o <br /> 4Y W 04 <br /> a <br /> DN:SLOPE 9:12 3 Q co <br /> 03 <br /> j NEW ROOF A j m 3 <br /> NEW RIDGE i LL O NEW RIDGE p- w <br /> I <U �LyL <br /> I I z w _�2 CD <br /> 1 <br /> A4.1 N:SLOPE 9:12 ' LL <br /> o <br /> I I wY O w <br /> I z <br /> L <br /> DN:SLOPE 9:12 <br /> j I Q Q <br /> fr <br /> 1 I U <br /> W <br /> I <br /> Z Z) <br /> J 0----- w <br /> ------------------ -------F — <br /> UZ <br /> Z) < N <br /> EL <br /> (j o W <br /> 0 <br /> Z m o y u <br /> NEW. ROOF PLAN Z N 3 <br /> 2 „4 <br /> O D_ <br /> m = <br /> u <br /> u- o <br /> CITY OF EVERETT 0 W k <br /> REVIEWED FOR PERMIT z N O <br /> a Q Q <br />