Laserfiche WebLink
0 <br /> ©20235TARBUCKS COFFEE COMPANY <br /> STARBUCKS° <br /> 2401 UTAH AVENUE SOUTH <br /> SEATTLE,WASHINGTON 98134 <br /> (206)318-1575 <br /> THESE DRAWINGS AND THE PROJECT MANUAL <br /> ARE CONFIDENTIAL AND SHALL REMAIN THE <br /> SOLE PROPERTY OF STARBUCKS <br /> NOTE: PVC adhesive(not provided)must CORPORATION,WHICH IS THE OWNER OF THECOPYRIGHT IN THIS WORK.THEY SHALL NOT <br /> be applied wherever PVC couplings BE REPRODUCED(IN WHOLE OR IN PART), <br /> -- and pipe are fitted together. (.•%' SHARED WITH THIRD PARTIES OR USED IN ANY <br /> fI••,;P«e MANNER ON OTHER PROJECTS OR <br /> • ...% EXTENSIONS TO THIS PROJECT WITHOUT THE <br /> * — * �� , PRIOR WRITTEN CONSENT OF STARBUCKS <br /> T. -f CORPORATION.THESE DRAWINGS AND <br /> 5:. I SPECIFICATIONS ARE INTENDED TO EXPRESS <br /> DESIGN INTENT FORA PROTOTYPICAL <br /> STARBUCKS STORE(WHICH IS SUBJECT TO <br /> CHANGE AT ANYTIME)AND DO NOT REFLECT <br /> ACTUAL SITE smw i CONDITIONS.SHALL HAVE ANY OBLIGATION NOR IABILITY70 <br /> - m <br /> ^^W THE OTHER(EXCEPT STATED ABOVE)UNTIL A B m <br /> * a r« WRITTEN AGREEMENT IS FULLY EXECUTEDY <br /> noe.•+ BOTH PARTIES. <br /> nl <br /> w STARBUCKS TEMPLATE VERSION:i2023.04.24 <br /> A <br /> w ARCHITECT OF RECORD <br /> * Figure 1. Loop area preparation Figure 2. 'Loop layout and connections GRAPHITE <br /> • Flatten the loop(folded for shipping)as shown in Figure 2(1). Fit the pipe securely into the <br /> couplings(2). Lay the loop flat in the drive-thru lane and position it as shown in Figure 2. GRAPHITE DESIGN GROUP,LLC,ARCHITECTS <br /> Elevate the loop on supports that are anchored to the ground,as shown in Figure 3. Level the 1807 7TH AVENUE,SUITE 700 <br /> loop so it will be 2 inches(51 mm)or less from the paved surface when the concrete is poured. SEATTLE,WA 98101(206)224.3335 <br /> Fasten the loop to the supports with wire,so it will not float when the concrete is poured. <br /> • Pull the loop wires through the PVC loop extension(4). Slide one and of the sleeve coupling(3) <br /> over the nipple on the corner fitting of the loop(5),and slide the end of the loop extension into <br /> the other end of the sleeve coupling. 9335 REGIS <br /> • Pull the loop wires through the elbow coupling(6)and the remaining 2 foot(.61 meter)piece of <br /> PVC(7). Slide the two ends(of 4&7)into the coupling(6),positioning the piece of PVC(7)so <br /> it points upward,out of the ground. Be certain it is next to and parallel to the outlets of the <br /> conduit Coming into the speaker post or menu board from the building. <br /> HILL <br /> 2-(w,nR,wawsa TEOF LEENGT <br /> a.Plru e. IwPsaS.en.e.m (zos.zs'�°nn STi11EOf WASHINGTUN <br /> CenCnb upMllweonenY (� <br /> (152-2i; m)_ InapMe BWitlina <br /> a 5antl - - <br /> M Mne°5Mr L-p a pporo sp.. <br /> Po51 <br /> Figure 3. Side view of loop in asphalt or concrete <br /> VEHICLE DETECTOR LOOP SCHEMATIC = <br /> 6 auie:12"=1'-0' <br /> 0 <br /> 0� ? N <br /> DO <br /> ADJUST DETAIL AS REQUIRED BY <br /> MANUF.FOR ILLUMINATED BOLLARD N Q Q <br /> 38"x 38" )MIN.CLEAR LOU Q ? <br /> CONCRETE AREA ACCESSCESS <br /> DOME (2)CONDUIT FROM DOS 2'-5' (�r -4'-2"(1270MM)1 6'-1"(1854MM) 410°� O <br /> POST,ROUTE TO DRIVE THRU Q 0 m <br /> 6"(150mm WINDOW (737MM) 15'-2"4623MM MIN.CUR.AREA (1)CONDUIT, <br /> I ( ) <br /> (1)CONDUIT FROM DOS <br /> (I;a::,.)II �� I ,• ROUTE TO HSTEEL PIPE FILLED LU UH- Z LU <br /> WITH CONCRETE POST,ROUTE TO ELECTRICAL I ELECTRICAL W <br /> O LLIPANEL PANEL <br /> 11{ EXPANSION +}_____�,.°___F__}__________ _T_________ CONCRETE MO <br /> ________ <br /> JOINT(SEALANT) DOS POST I ��� III i FOOTING 0- W Q. W <br /> CL PAVING OR NON-ILLUMINATED I / / MENU BOARD <br /> 4'-6" IL 80, I' I CONCRETE BOLLARD ON CONCRETE I / STORE#: 22817 <br /> SLAB FOOTING. I r F' I - - -—- lii <br /> (1372 MM) / L".�1 _ 1 PROJECT#: 60007-039 <br /> i SEE DETAIL 21A003 ,., - liI I <br /> _ ----1__� F O I --- / I ISSUE DATE: 10/27I2023 <br /> ____ <br /> DESIGN MANAGER: GRAPHITE <br /> (1)CONDUIT, " I•'1 °? <br /> :. e1 <br /> i ROUTETO :I_-J.,, I iv _____ I PRODUCTION DESIGNER: GRAPHITE <br /> U 1 CHECKED BY: GRAPHITE <br /> ELECTRICAL �i I' 1 <br /> PANEL I'.1 CONCRETE <br /> " FOOTING BY GC N Revision Schedule <br /> `• O / to -4'•.I:.. -� CANOPY POST(TYP.1 OF 2) I (1)CONDUIT,STUB UP FOR CANOPY LIGHTING, <br /> MENU BOARD O _ CONCRETE FILLED Rav Dete B ascription <br /> OUTLINE OF CANOPY ABOVE �~ I ROUTE TO SIGNAGE POWER y p <br /> e E CONCRETE ~a -� I• .+'.-Ul- I n[z <br /> ! a w EDGE OF CONCRETE FOOTING(DATUM POINTS <br /> _ Z_ FOOTING �- :I'. -Il_ I I __ <br /> i ° -um NOTES. I, I REPRESENT CENTER OF(2)CANOPY BASE PLATES) <br /> - - ,° -11 1.IF UTILIZING EXISTING FOOTING(S)FOR IGNAGE <br /> INSTALLATION,FASTEN TO EXISTING THREADED I DIGITAL ORDER SCREEN(DOS)AND SPEAKER <br /> ., BOLTS AND PROVIDE CONDUIT AS NOTED, EDGE OF CONCRETE CURB <br /> ENSURE BOLTS ARE IN SOUND CONDITION. CONDUIT TO DOS POST <br /> CONCRETE BOLLARD EDGE OF 2.IF ABANDONING EXISTING FOOTING(S)IN PLACE, I SHEET TITLE: <br /> ON CONCRETE CONCRETE 40'-0" 12M TO CENTERLINE OF - ,�-0„➢T nT CUT CONDUIT AND THREADED BOLTS FLUSH TO I - - - DETECTOR LOOP EDGE CENTERED ON DOS POST 2"(51MM) ARCHITECTURAL SITE <br /> FOOTING SEE DETAIL CURB ORDER POINT MENU BOARD TOP OF FOOTING. it li 1 BELOW FINAL GRADE IN CONDUIT OR SAWCUT.VERIFY NO <br /> 2/A003 DIAMETER METAL IN SLAB WITHIN 36"(915MM)OF LOOP. DETAILS <br /> PRE-MENU 30 DEG L CONCRETE BOLLARD DTE -5 PANEL 100 DT MENU BOARD, DIGITAL ORDER SCREEN W CANOPY SCALE:AS SHOWN <br /> awe:12"=1'-0" sn•:3/4"=V-0" �J anie:12"=1'-0" SHEET NUMBER: <br /> A004 <br />