Laserfiche WebLink
ABBREVIATIONS MECHANICAL SYMBOL LEGEND GENERAL MECHANICAL NOTES �► <br /> AFF ABOVE FINISHED FLOOR 1. MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE _ <br /> AHJ AUTHORITIES HAVING JURISDICTION <br /> APPROX APPROXIMATE ® TYPICAL SUPPLY DUCT UPA)N DUCT HEATER GENERAL CONTRACTOR TO PATCH AND REPAIR ALL EXISTINGWALLS,FLOORS,CEILINGS OR OTHER SURFACES IDENTIFIED TO <br /> BLDG BUILDING MANUAL VOLUME <br /> REMAIN THAT MAY BECOME DAMAGED DURING THE COURSE OF LU <br /> TYPICAL EXHAUST UP/DN RETURN DAMPER DUCT DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL INTENT N <br /> OR WORK. <br /> ,A <br /> CO2 CARBON DIOXIDE 2. <br /> CD CEILING DIFFUSER I�1 g BACK DRAFT DAMPER OR ARRANGEMENT OF SYSTEM 5 <br /> CLG CEILING �,I TURNING VANE. COMPONENTS NEEDED WHETHER INDICATED OR NOT TO H&INSTALL PROVIDEC CONSTRUCTION LL��� <br /> A COMPLETE AND OPERATING SYSTEM. <br /> CXA XA COMMISSIONING AGENT C SMOKE DETECTOR � ©TOR38TAnBOCK9 ClIFFEECOMPFM' <br /> DEG DEGREE. EF-1 EQUIPMENT DESIGNATION 3. CONTRACTOR TO VERIFY ALL DIMENSIONS,INCLUDING <br /> DM STARBUCKS DESIGN MANAGER COMBINATION CLEARANCES REQUIRED BY OTHER TRADES,AND NOTIFY S T A R B U C K S' <br /> SMOKE AND FIRE <br /> ON DOWN THERMOSTAT STARBUCKS CONSTRUCTION MANAGER OF ANY DISCREPANCIES <br /> DAMPER PRIOR TO PROCEEDING WITH THE WORK,ALL DIMENSIONS ARE TO DTL DETAIL SPIN-IN TAKE-OFF THE FACE OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE. _ 26S N KS,NEVAD 894 1 <br /> DWG(S) DRAWING(S) © THERMOSTAT SENSOR AND VOLUME HVAC EQUIPMENT AND MATERIALS ALL DIMENSIONS TO BE TAKEN FROM ACTUAL BUILDING ` SPARKS,NEVADA89431 <br /> EA EACH / DAMPER DIMENSIONS. r (775)331-8551 <br /> EC ELECTRICAL CONTRACTOR -+.� SUPPLY AIR ARROW \:l- UNDERCUT DOOR FILTERS 4. THE MECHANICAL CONTRACTOR SHALL COORDINATE HVAC WORK THESE DRAWINGS AND THE PROJECT MANUAL <br /> EDP EQUIPMENT CONTROL PAC IF OPERATING HVAC DURING CONSTRUCTION,PROVIDE THREE 3 SETS WITH OTHER TRADES.THE ARCHITECTURAL DRAWINGS AND ARE CONFIDENTIAL AND SHALL REMAIN THE <br /> EG EXHAUST GRILLE () <br /> ELEC ELECTRICAL RETURN AIRARROW ® CONNECT TO EXISTING OF 2"(51MM)MERV6 PLEATED DISPOSABLE FILTERS(OR HIGHER RATING PROJECT MANUAL SHALL TAKE PRECEDENCE OVER ALL OTHER = SOLE PROPERTY OF STARBUCKS <br /> EM EMERGENCY IF REQUIRED BY LEED).USE ONE SET UNTIL COMPLETION OF DRAWINGS.SEE ARCHITECTURAL DRAWINGS AND PROJECT CORPORATION,WHICH IS THE OWNER OF THE <br /> CONSTRUCTION.INSTALL ONE SET AT COMPLETION OF CONSTRUCTION MANUAL FOR DIMENSIONED DIFFUSER LOCATIONS AND MOUNTING COPYRIGHT IN THIS WORK.THEY SHALL NOT <br /> EXIST EXISTING <br /> EMS ENERGY MANAGEMENT SYSTEM INDICATES UNLINED I2'X8"O.D.SHEETMETAL (PRIOR TO TAB)AND DELIVER ONE SET OF MERV13 FILTERS TO HEIGHTS WHERE EXPOSED. BE REPRODUCED IN WHOLE OR IN PART EXT EXTERIOR 12 X 8 1 ST FIGURE=SIDE SHOWN STARBUCKS LABELED TO DENOTE THEIR RESPECTIVE LL SHARED WITH THIRD PARTIES OR USED IN ANY <br /> 2N0 FIGURE=SIDE NOT SHOWN AIR HANDLING UNIT. 5. NEW DUCTWORK AND EQUIPMENT SHALL NOT BE INSTALLED r MANNER ON OTHER PROJECTS OR <br /> WHERE IT OBSTRUCTS ANY EXISTING OR NEW AREAS THAT ��//�� EXTENSIONS TO THIS PROJECT WITHOUT THE <br /> F&I FURNISH&INSTALL INDICATED 14"X 10'(355mm X255mm)O.D. BRACING AND ANCHORING REQUIRE ACCESS. V/ PRIOR WRITTEN CONSENT OF STARBUCKS <br /> FDIC FURNISHED BY OWNER, 12 X 8 SHEETMETAL W/1"(25mm)SOUNDLINER ALL MECHANICAL EQUIPMENT,FIXED OR FLEXIBLY MOUNTED,SHALL BE CORPORATION.THESE DRAWINGS AND <br /> INSTALLED BY CONTRACTOR (U.N.0),12"X B"(305mm X 205mm I.D.NET FOIO FURNISHED BY OWNER, BRACED OR ANCHORED TO COMPLY WITH LOCAL CODES. 6. INSULATE DUCTWORK PER CODE AND SPEC.REQUIREMENTS. Z SPECIFICATIONS ARE INTENDED TO EXPRESS <br /> COORDINATE CLEARANCE REQUIREMENTS FORADDED DESIGN INTENT FOR A PROTOTYPICAL <br /> INSTALLED BY OWNER FLEXIBLE DUCT CONNECTION <br /> FLR FLOOR INSULATION. O STARBUCKS STORE(WHICH IS SUBJECT TO <br /> FT FOOT/FEET r DUCTWORK AND ACCESSORIES 7, ALL IS NEW UNLESS NOTED OTHERWISE. ,+ ACTUALSTE AT ANYTIME <br /> IT) <br /> )IAND DO NOT R REFLECT <br /> ARTY <br /> G GAS PIPING LCL� FLEXIBLE DUCT V SHALL HAVE ANY OBLIGATION NOR LIABILITY TO <br /> GC GENERAL CONTRACTOR SHEET METAL DUCTWORK THE OTHER(EXCEPT STATED ABOVE)UNTIL A <br /> ASSEMBLE AND INSTALL DUCTWORK IN ACCORDANCE WITH RECOGNIZED GENERAL NOTES WRITTEN AGREEMENT IS FULLY EXECUTED BY <br /> HR HOUR 12'* NECK SIZE INDUSTRY PRACTICE FOR ACHIEVING AIR TIGHT(5%LEAKAGE)AND BOTH PARTIES. <br /> HVAC HEATING,VENTILATION,AIR CONDITIONING NOISELESS(NO OBJECTIONABLE NOISE)SYSTEMS.NO VARIATION OF <br /> CD-1 400 DESIGN CFM(WHERE APPLICABLE) DUCT CONFIGURATION OR SIZES WILL BE PERMITTED EXCEPT BY SCOPE O STARBUCKS TEMPLATE VERSION:i2023.0424 <br /> I.D. IN DIAMETER \ DIFFUSER TYPE(REFER SCHEDULE) <br /> PERMISSION FROM THE ENGINEER. THE INTENT OF THE PROJECT MANUAL AND THE DRAWINGS IS TO <br /> AQ INDOORDOORAIR QUALITY A, PROVIDE A COMPLETE AND FULLY OPERATIONAL MECHANICAL SYSTEM. • ARCHITECT OF RECORD <br /> DAMPERS THE MECHANICAL CONTRACTOR SHALL FURNISH ALL LABOR,MATERIAL, U. <br /> LCP LIGHTING CONTROL PANEL PROVIDE CONVENIENTLY LOCATED ACCESS DOORS OF AMPLE SIZE AND AND EQUIPMENT NECESSARY TO COMPLETE THE MECHANICAL WORK. <br /> LL LANDLORD O ®� CEILING DIFFUSER(FLOW ARROWS QUANTITY FOR SERVICING THE DAMPERS.PROVIDE MOTORIZED DAMPERS '°VI�`➢�^'a .x P^ �°� <br /> LV LOW VOLTAGE SHOWN ONLY IF AIR FLOW NOT AT ALL INTAKE&EXHAUST BUILDING OPENINGS.COORDINATE WITH SITE EXAMINATION Q emdea��. <br /> SYMMETRICAL) OTHER TRADES FOR ACCESS PANELS,POWER AND FIRE ALARM THE MECHANICAL CONTRACTOR SHALL THOROUGHLY EXAMINE ALL <br /> MAX MAXIMUM INTERFACES.SEE PROJECT MANUAL. AREAS WHERE EQUIPMENT,DUCTWORK,AND PIPING WILL BE INSTALLED <br /> MC MECHANICAL CONTRACTOR \ �1, CEILING RETURN/EXHAUST GRILLE AND WILL REPORT ANY CONDITION THAT,IN HIS OPINION,PREVENTS THE UJI <br /> MECH MECHANICAL V ACOUSTICAL DUCT LINER PROPER INSTALLATION OF THE MECHANICAL WORK GRAPHITE DESIGN GROUP,LLC,ARCHITECTS <br /> MEP MECHANICAL,ELECTRICAL AND PLUMBING UNLESS OTHERWISE INDICATED ON THE PLANS,PROVIDE V(25MM) Q 1807 7TH AVENUE,SUITE 700 <br /> MFG MANUFACTURER ACOUSTICAL DUCT LINER IN SUPPLY AND RETURN DUCTWORK WITHIN 10'- PENETRATIONS SEATTLE,WA 98101 <br /> MIN MINIMUM CONTROLS AND OPERATION NOTES 0'(305CM)OF THE DISCHARGE AND INTAKE OF AIR HANDLING UNITS. WHERE PIPESAND DUCTS PENETRATE WALL,SEAL OPENINGS 70 Z (208)224-3335 <br /> INCREASE DUCT SIZE INDICATED ON PLANS AS NEEDED TO PREVENT AIR TRANSFER BETWEEN SPACES.USE FIRE RATED SEALANTS <br /> NTS NOT TO SCALE - - - - - - - - - - - - - - - - - - - ACCOMMODATE LINER.LINER TO BE PROVIDED AND FASTENED TO DUCT ON ALL FIRE SEPARATION PENETRATIONS,INCLUDING FLOORS.SEAL W <br /> THE GENERAL CONTRACTOR SHALL FURNISH AND INSTALL THE WITH MECHANICAL LINER FASTENERS IN ACCORDANCE WITH SMACNA AND AROUND ALL PIPES AND DUCTS PENETRATING FIRE SEPARATIONS WITH <br /> O.D. OUTSIDEDIMENSION FOLLOWING COMPONENTS: PROJECT MANUAL. NON-COMBUSTIBLE PACKING RETAINED BY METAL COLLARS.THE � �y ROY SCy <br /> OSA OUTSIDE AIR ASSEMBLY SHALL BE APPROVED BY STATE FIRE MARSHALL, <br /> CONTROL WIRING FLEXIBLE DUCTWORK <br /> REF REFERENCE THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL CONTROL FLEXIBLE DUCT WORK SHALL ONLY BE INSTALLED AS SHOWN IN PLAN AND STANDARDS Z h 4 F <br /> REQ'D REQUIRED WIRING IN CONDUIT NECESSARY FOR THE COMPLETE AND PROPER NOT ABOVE HARD LID CEILINGS.FLEXIBLE DUCTWORK SHALL NOT EXCEED EQUIPMENT AND MATERIALS SHALL CONFORM WITH THE APPROPRIATE <br /> REV REVISION OPERATING TEMPERATURE CONTROL SYSTEM INCLUDING ALL MODES 5'-0'(152CM)IN LENGTH AND TWO 45°ELBOWS.IT SHALL BE PULLED TAUT PROVISIONS OF CSA,ULC,ARL,ASME,ASTM,UL,NEMA,ANSI,SMACNA, <br /> RT ROOFTOP OF OPERATION AND INTERLOCK. AND APPROPRIATELY FASTENED TO RIGID BRANCH DUCT&DIFFUSER ASHRAE,NFPA,AS APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY. qE 31 <br /> BENDS SHALL BE MINIMIZED AND WHERE NEEDED BE A FULL RADIUS BEND,SF SQUARE FEET EXHAUST FANS SUPPORT BANDS SHALL BE INSTALLED SO AS TO NOT CRIMP FLEX DUCT. CODES <br /> SH7 SHEET RESTROOM EXHAUST FAN(S)TO BE OPERATED IN CONJUNCTION WITH FLEXIBLE DUCTWORK SHALL MEET REQUIREMENTS. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL O ONAL DO..roZ/s <br /> SPECS SPECIFICATION(S) STORE HOURS UNLESS OTHERWISE NOTED OR APPROVED OR AS APPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES.IN CASE f <br /> SST STAINLESS STEEL REQUIRED BY JURISDICTION(COORDINATE WITH ELECTRICAL). OF CONFLICT BETWEEN THE DRAWINGS AND PROJECT MANUAL AND THE Z <br /> TESTING, ADJUSTING, BALANCING CODES AND ORDINANCES,USE WHICHEVER IS MORE STRINGENT.THE <br /> TEMP TEMPORARY THERMOSTAT MECHANICAL CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS <br /> TYP TYPICAL PERMANENT THERMOSTAT(S)AND REMOTE SENSOR(S)SHALL BE MINIMUM STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS. <br /> FURNISHED AND INSTALLED.ONE THERMOSTAT AND SENSOR IS INDEPENDENT AIR BALANCE CONTRACTOR OR QUALIFIED MECHANICAL <br /> UNO UNLESS NOTED OTHERWISE PROVIDED FOR EACH UNIT.MOUNT THERMOSTA7(S)AND SENSOR(S) I CONTRACTOR SHALL BE QUALIFIED BY NEBB OR AABC STANDARDS. PERMITS AND FEES <br /> UC UNDER COUNTER THE MECHANICAL CONTRACTOR SHALL PROCURE AND PAY FOR ALL <br /> IN LOCATION&HEIGHT AS INDICATED ON DRAWINGS,MECHANICAL OUTSIDER R,EXHAUST FATELY BALANCE(WHERE <br /> AY RETURN AND <br /> CONTRACTOR TO PROVIDE THERMOSTAT IDENTIFICATION LABELS PER OUTSIDE AIR,EXHAUST FAN(S),HYDRONIC(WHERE APPLICABLE)AND PERMITS,FEES,AND INSPECTIONS NECESSARY 70 COMPLETE THE <br /> WH WATER HEATER SPECIFICATION REQUIREMENTS.REFER TO THERMOSTAT SETUP EXHAUST FAN(S)SYSTEMS TO PROVIDE AIR AND WATER QUANTITIES WITHIN MECHANICAL WORK. <br /> r <br /> WSHP WATER SOURCE HEAT PUMP INSTRUCTIONS BELOW FOR ADDITIONAL REQUIREMENTS. PLUS MINUS THE VALUES INDICATED THE DRAWINGS AND IN THE <br /> SPECIFICATIONS <br /> UN WARRANTY = Q SPECIFICATIONS UNLESS MANUFACTURER REQUIRES TIGHTER <br /> THERMOSTAT SETUP INSTRUCTIONS TOLERANCES.OPERATE AUTOMATIC CONTROLS SYSTEMS AND VERIFY THE MECHANICAL CONTRACTOR SHALL UNCONDITIONALLY WARRANT Z L <br /> PROVIDE THE FOLLOWING SETUP AND PROGRAMMING: SETPOINTS FOR THERMOSTATS,CO2 SENSORS,DCV,EMS AND ALL WORK TO BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP fCo <br /> 1. CONFIGURE AS FOLLOWS: ECONOMIZER/OUTSIDE AIR DAMPER.SEE CONTROLS AND OPERATION FOR A PERIOD OF ONE(1)YEAR FROM THE DATE OF FINAL ACCEPTANCE Q <br /> A. DEGREES <br /> NOTES AND HVAC SCHEDULES AND NOTES FOR DETAILS.IF DEFICIENCIES BY STARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORK O r- <br /> L DISPLAY OR SITE CONDITIONS PREVENT COMPLETE AND PROPER BALANCING,00 PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTING <br /> B. 12 N CLOCK NOT COMPLETE WORK AND SUBMIT A REQUEST FOR INFORMATION TO GET WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS �( <br /> C. CONTINUOUS FAN OPERATION IN OCCUPIED ry <br /> MODE COMPLETE INFORMATION PRIOR TO COMPLETING WORK.SUBMIT THREE(3) AND WORKMANSHIP. <br /> D. DISABLE KEYBOARD PROGRAMMING COPIES OF THE BALANCE REPORT TO THE ENGINEER,CONSTRUCTION <br /> S Y NA B O L S 2. SET TIME AND DATE. MANAGER AND COMMISSIONING AGENT FOR APPROVAL.THE BALANCE O <br /> 3. SET TO DISPLAY CURRENT TEMPERATURE. REPORT SHALL INCLUDE NEBB OR AABC CREDENTIALS, LANDLORD REQUIREMENTS Z <br /> H E A T I N D-Y E N T I L A T I N C-AIR CONDITIONING 4. SET OCCUPIED START TIME AT 30 MIN.BEFORE OPENING. EQUIPMENTANSTRUMENT LIST WIT THE MOST RECENT CALIBRATION DATE 00 LLM I <br /> SET UNOCCUPIED START TIME AT 30 MIN.AFTER CLOSING. AND BALANCE REPORTS FOR ALL HVAC AND EXHAUST SYSTEMS.T&B W LU LU W L1.1 <br /> SYMBOL DESCRIPTION VERIFY HOURS WITH STORE MANAGER OR REPORT SHOULD MATCH NEBB OR AA13C STANDARD REPORTS INCLUDING PRIOR TO BID: THE GENERAL CONTRACTOR SHALL COORDINATE WITH Q pO <br /> THERMOSTAT CONSTRUCTION MANAGER. UNIT TEST DATA WITH TEMPERATURES,PRESSURES AND STATIC PRESSURE LANDLORD/BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS. <br /> I S. SET PO NITS SHALL BE AS FOLLOWS OR AS APPROPRIATE PROFILES.INCLUDE A COPY OF THE BALANCE REPORT AS APPROVED BY IF LANDLORD/BUILDING OWNER DOES HAVE REQUIREMENTS, w a Q Z IL <br /> Q REMOTE SENSOR FOR CLIMATE: THE ENGINEER WITH APPLICATION FOR FINAL CONTRACT PAYMENT. CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR WITH 1.V U O U Q W <br /> A. OCCUPIED(5°F DEADBAND)(3°C DEADBAND) REQUIREMENTS AND ADHERE TO THEM.WHERE LANDLORD!BUILDING W W <br /> ® SUPPLY DIFFUSER I. HEATING: 70'F(21"C) OWNER REQUIREMENTS ARE MORE STRINGENT THAN SHOWN IN THESE -i r <br /> COOLING: 75°F(24°Cy <br /> PLANS IN THE OPINION OF THE ENGINEER)B. UNOCCUPIED .LANDLORD/BUILDING OWNER MM <br /> II. i IAQ MANAGEMENT PLAN REQUIREMENTS SHALL GOVERN. d W d O RETURN OR EXHAUST GRILLE <br /> I. HEATING: 60°F(15°C) J <br /> II. COOLING: 78°F(25'C) DURING CONSTRUCTION,CONTRACTOR SHALL COMPLY WITH CHAPTER 3 <br /> SUPPLY OR FRESH AIR DUCT OF SMACNA'S IAQ GUIDELINES FOR OCCUPIED BUILDINGS UNDER <br /> ® (SA OR FA 6. SET TWO(2)HOUR OCCUPIED SET POINT OVERRIDES: <br /> S: W STORE#: 22817 <br /> ) PROVIDE THE FOLLOWING SET POINT OVERRIDES: I CONSTRUCTION.CONTRACTOR SHALL PERFORM AND SUBMIT ALL <br /> RETURN OR EXHAUST AIR DUCT A. HEATING: +2'F(1°C) INFORMATION AS REQUIRED.IF HVAC SYSTEM IS TO BE USED DURING PROJECT#: 60007-039 <br /> z (RA OR EA) B COOLING: -2'F(1"C) CONSTRUCTION,INSTALL MERV 8 FILTERS AT EACH RETURN AIR GRILL ISSUE DATE: 10.2.2023 <br /> RECTANGULAR DUCT <br /> AND COMPLY WITH SMACNA'S GUIDELINES. W DESIGN MANAGER: GRAPHITE <br /> FIRST FIGURE IS SIDE SHOWN DEMAND CONTROL VENTILATION(DCVI <br /> THE CO2 SENSOR SHALL MODULATE THE AIR HANDLING UNIT OUTSIDE PRODUCTION DESIGNER: GRAPHITE <br /> 20 ROUND DUCT AIR DAMPER TO MAINTAIN 1000 PPM CO2 OR LESS ENERGY MANAGEMENT SYSTEM (EMS) CHECKED BY: <br /> � OCCUPIED MODE: <br /> VOLUME DAMPER(ELEV AND PLAN) 1. FAN SHALL RUN CONTINUOUSLY WHILE BRINGING IN <br /> MINIMUM DCV OUTSIDE AIRAS INDICATED IN SCHEDULE. THE GENERAL CONTRACTOR SHALL INSTALL(OR DEMOAND REINSTALL Z Revision Schedule <br /> TURNING VANES 2. IF CO2 SENSOR SET POINT IS BELOW THE SETPOINT,THE FOR RENOVATIONS)THE VENSTAR SURVEYOR EMS SYSTEMS PRIOR TO Rev Date B Description <br /> AR DAMPER SHALL BE OPEN TO THE CALCULATED DCV THE LAST WEEK OF CONSTRUCTION.MECHANICAL CONTRACTOR TO /A P n <br /> CFM SUPPLY REGISTER OR GRILLE(R OR G) MINIMUM OUTSIDE AIR. INSTALL ONE PERMANENT THERMOSTAT AND REMOTE SENSOR PER HVAC V <br /> SIZE 3. IF CO2 SENSOR SETPOINT IS EXCEEDED,OUTSIDE AIR UNIT,AS PROVIDED BY VENSTAR LOCATE AND MOUNT THERMOSTAT(S) <br /> CFM DAMPER SHALL MODULATE 70 MAINTAIN 1000 PPM NOT TO AND SENSOR(S)PER THE DRAWINGS.INSTALL THERMOSTAT <br /> SIZE RETURN REGISTER OR GRILLE(R OR G) EXCEEDTHE CALCULATED DESIGN MINIMUM OUTSIDE AIR. IDENTIFICATION LABELS PER VENSTAR SPECIFICATIONS. N <br /> 4. UPON CO2 PPM FALLING BELOW THE SETPOINT OF 1000 <br /> CFM FRESH AIR INTAKE(FA) PPM,THE AIR DAMPER SHALL RETURN TO DCV MINIMUM MECHANICAL CONTRACTOR TO COMPLETE FINAL CONNECTIONS FROM W <br /> SIZE OUTSIDE AIR. SURVEYOR DATA CONCENTRATOR TO STORE ROUTER PRIORTO SHEET TITLE: <br /> SQUARE CEILING DIFFUSER S. THE ECONOMIZER SHALL HAVE PRIORITY OVER THE DCV CONTACTING VENSTAR(818-812-0812).VENSTAR TO PROGRAM THE HVAC <br /> (SUPPLY) CONTROLS,OUTSIDE AIR MAY EXCEED DCV MINIMUM AND AND/OR LIGHTING CONTROLS WITH STANDARD STARBUCKS MECHANICAL NOTES <br /> DESIGN MINIMUMWHEN AIR CONDITIONS ARE SETTINGS.FOR ASSISTANCE CON WTHORTROUBLESHOOTING OF THE <br /> APPROPRIATE TO DO SO. SURVEYOR CONTROLS,CONTACT VENSTAR. <br /> UNOCCUPIED MODE: SCALE:AS SHOWN <br /> 1. FAN SHALL CYCLE WITH HEATING AND OUTSIDE AIR <br /> r DAMPER CLOSED.OUTSIDE DAMPER SHALL NOT BE I SHEET NUMBER: <br /> R CYCLED WITH CO2 PPM SETPOINT. .XI II ICRJ�. <br /> y �.... M001 <br />