Laserfiche WebLink
ITEMS TO DEMOLISH ITEMS TO PRESERVE KEYED NOTES GENERAL NOTES <br /> CAFE CAFE 1. EXISTING TO REMAIN(ETR). A. IF DURING DEMOLITION CONDITIONS ARE REVEALED <br /> D1. ALL LARGE PENDANT LIGHTING Pt. (2)TRACK LIGHTS WITH HEADS THAT MAY JEOPARDIZE INTEGRITY OF STRUCTURE OR _ <br /> D2. ALL SMALL PENDANT LIGHTING 2. DEMOLISH HARD LID CEILING,FRAMING AND ASSOCIATED PRECLUDE FOLLOWING DESIGN INTENT,GENERAL <br /> D3. 12,TRACK AND ALL HEADS ENGINE FASTENERS TO BOTTOM OF STRUCTURE ABOVE. CONTRACTOR TO NOTIFY STARBUCKS CONSTRUCTION <br /> D4. PORTION OF EXPOSED HVAC SPIRAL DUCTING TO P10. (2)CAMERAS MANAGER IMMEDIATELY. <br /> BE REMOVED.SHOWN FOR REFERENCE ONLY. 3. REMOVE EXISTING SOFFIT AS SHOWN. <br /> REFER TO MECHANICAL DRAWINGS FOR SPECIFIC WORKROOM B. REMOVE EXTRANEOUS EQUIPMENT AS NECESSARY. <br /> SCOPE. P20. EMERGENCY LIGHT 4. REMOVE EXISTING LIGHTING,WIRING,CONTROLS AND <br /> D5. ALL SPEAKERS FASTENERS BACK TO ELECTRICAL PANEL AS SHOWN. C. EXISTING SPRINKLERS TO REMAIN OPERATIONAL <br /> D8. EMERGENCYLIGHT DURING CONSTRUCTION. <br /> 5. REMOVE EXISTING SECURITY CAMERAS,LOW VOLTAGE ©zozz sTnaeucrcs COFFEE COMPANY <br /> ENGINE CABLING AND ASSOCIATED CONDUITS.CAMERAS SHALL D. DEMOLISH AND REMOVE SUSPENDED ACOUSTIC LAY-IN, <br /> D10. ALL LIGHTING BE SALVAGED FOR FUTURE REUSE. SPLINE OR GYPSUM/PLASTER CEILING INCLUSIVE OF STARBUCKS° <br /> D11. ALL DIFFUSERS HANGERS AND CARRYING CHANNELS,WIRES,CABLES, <br /> 6. REMOVE EXISTING SPEAKERS,LV CABLING AND CONDUIT,ADHERED CEILING TILES,FLEX CONDUIT, 2401 UTAH AVENUE SOUTH <br /> WORKROOM ASSOCIATED FASTENERS. ELECTRICAL BOXES,SMOKE DETECTORS,LIGHT <br /> D20. ALL TROFFERS-NEW TO BE INSTALLED IN PLACE FIXTURES AND WIRING,DUCT WORK,PIPING AND SEATTLE,WASHINGTON 98134 <br /> D21. ALL GRILLES-NEW TO BE INSTALLED IN PLACE 7. REMOVE EXISTING DUCTWORK AND ASSOCIATED SUPPORT HANGERS,CUT HANGERS FLUSH.SPACES (206)318-1575 <br /> D22. CAN LIGHT FASTENERS BACK TO MAIN TRUNK LINE. RECEIVING WALL DEMOLITION WILL ALSO HAVE CEILING <br /> DEMOLITION UNLESS OTHERWISE NOTED. THESE DRAWINGS AND THE PROJECT MANUAL <br /> RESTROOM 8. SEE SHEET D201 FOR ALL BUILDING EXTERIOR FACADE ARE CONFIDENTIAL AND SHALL REMAIN THE <br /> D30. SCONCE ITEMS TO BE DEMOLISHED OR RELOCATED.. E. REMOVAL OF LOW VOLTAGE EQUIPMENT,PERTAINING SOLE PROPERTY OF STARBUCKS <br /> TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE CORPORATION,WHICH IS THE OWNER OF THE <br /> 9. DEMOLISH ACT AS SHOWN. VERIFIED BY STARBUCKS CONSTRUCTION MANAGER COPYRIGHT IN THIS WORK.THEY SHALL NOT <br /> PRIOR TO REMOVAL.SALVAGED EQUIPMENT SHALL BE BE REPRODUCED(IN WHOLE OR IN PART), <br /> 10.ROOF ACESS HATCH TO REMAIN. STORED IN A CLIMATE CONTROLLED ENVIRONMENT FOR SHARED WITH THIRD PARTIES OR USED IN ANY <br /> FUTURE INSTALLATION. MANNER ON OTHER PROJECTS OR <br /> EXTENSIONS TO THIS PROJECT WITHOUT THE <br /> PRIOR WRITTEN CONSENT OF STARBUCKS <br /> CORPORATION,THESE DRAWINGS AND <br /> SPECIFICATIONS ARE INTENDED TO EXPRESS <br /> DESIGN INTENT FOR A PROTOTYPICAL <br /> STARBUCKS STORE(WHICH IS SUBJECT TO <br /> LEGEND CHANGE AT ANYTIME)AND DO NOT REFLECT <br /> ACTUAL SITE CONDITIONS.NEITHER PARTY <br /> SHALL HAVE ANY OBLIGATION NOR LIABILITY TO <br /> ITEM TO BE DEMOLISHED THE OTHER(EXCEPT STATED ABOVE)UNTIL A <br /> C— _ PRESERVE FOR FUTURE USE WRITTEN AGREEMENT IS FULLY EXECUTED BY <br /> —— BOTH PARTIES. <br /> EXISTING ITEM TO REMAIN STARBUCKS TEMPLATE VERSION:12021.10.22 <br /> ARCHITECT OF RECORD <br /> GRAPHITE <br /> GRAPHITE DESIGN GROUP,LLC,ARCHITECTS <br /> 1807 7TH AVENUE,SUITE 700 <br /> SEATTLE,WA 98101 <br /> (206)224-3335 <br /> 9335 REGIS_1 D <br /> 000o I <br /> MARnN LEE HILL <br /> STATE Of WASHINGTON <br /> N 9qi i 8 <br /> TYP. D2 <br /> D4 4 <br /> 9 <br /> 7FYP.D5 <br /> 4 } 'A 4 r I I o ic, 1 0 <br /> > < o O ❑ �^ r � I � U TYP.D1 U P7 == O O U <br /> 3 � t � e;f�� I D3 III I ♦ / ♦ / <br /> L <br /> 0 o 0 o Q <br /> 10 <br /> od00 <br /> Q N <br /> II O T<I TT IIOaWiAA fj�#lP S 6�� x 5 a II ` Q O <br /> II 8 1 / \ 10 / \II RItlpIIRRI r 7 a s v, - O DB ;)� U O ;)� ;)� li r a <br /> p / \ / \IIPBN)IIIINI I t dS (UA <br /> 05 <br /> --�a��,l, I ;) `' z 9 --- --1--- _III w o <br /> - _-- <br /> ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ __, 3 m <br /> II o o Z Q W Z N <br /> O O U O O O O O O O U O U U U p U O W <br /> --- g LU ILU <br /> r-_-r -� r--� -1 r--r O O <br /> \\ it IL jllll\\ / P. 21 Ir IIII\\ iI r rI Ir �I Ir-rl fY K O <br /> L_, 2 P. Ty 11 I I U <br /> I LL=�JI LL_JJ 9 Lt__-1JI 1 a H. r L�LI <br /> 2 1 = _ _ = Q C) <br /> 0 0 0` 0 0 0 Pi ♦ PRO E#: 22817-039 <br /> g) 1 g� I I o 6 ISSUE DATE: 10/27/2023 <br /> 5 <br /> --- --- --- -- DESIGN MANAGER: GRAPHITE <br /> -- ---r� PRODUCTION DESIGNER: GRAPHITE <br /> CHECKED BY: GRAPHITE <br /> LL-JJ <br /> Revision Schedule <br /> O U <br /> Rev Date By Description <br /> SHEET TITLE: <br /> DEMOLITION REFLECTED CEILING PLAN DEMO REFLECTED <br /> 1 =P-0" N CEILING PLAN <br /> 1/4" <br /> SCALE:AS SHOWN <br /> SHEET NUMBER: <br /> D102 <br />