Laserfiche WebLink
GENERAL NOTES <br /> 4 A. GENERAL CONTRACTOR TO COORDINATE AND SCHEDULE <br /> 1 SIGNAGE INSTALLATION WITH THE SIGNAGE CONTRACTOR <br /> 1 PROVIDING A MINIMUM SCHEDULING NOTICE OF 4 WEEKS <br /> AND 1 WEEK PRIOR TO SCHEDULED DATE OF <br /> _ INSTALLATION.CONSTRUCTION MANAGER TO PROVIDE <br /> _ GENERAL CONTRACTOR WITH SIGNAGE CONTRACTOR <br /> CONTACT INFORMATION. <br /> e e ® B. GENERAL CONTRACTOR SHALL COORDINATE WITH <br /> ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL ©rosx sTAseucKs COFFEE COMPANY <br /> TTHRU ELECTRICAL CIRCUITS INCLUDING ALL CONDUIT,WIRE, <br /> IT Rll >> NECESSTIONSAND ERVESIKERATPANELBOARD STARBUCKS" <br /> L---`— CONNECTIONS <br /> ONNE TIONS SERVE SIGNAGE. <br /> C. <br /> 2401 UTAH AVENUE SOUTH <br /> _ ~� WOOD STUD BLOCKING OR EQUIVALENT TO SUPPORT SEATTLE,WASHINGTON 98134 <br /> SIGNAGE. <br /> (206)318-1575 <br /> II D. SIGNAGE CONTRACTOR SHALL VERIFY SIZE AND <br /> II O II LOCATION OF ANY AND ALL ALLOWABLE MONUMENT OR THESE DRAWINGS AND THE PROJECT MANUAL <br /> ARE CONFIDENTIAL AND SHALL REMAIN THE <br /> POLE SIGNAGE AND PROVIDE SHOP DRAWING(S)PRIOR <br /> II _ TO FABRICATION TO THE STARBUCKS DESIGNER FOR SOLE PROPERTY OF STARBUCKS <br /> CORPORATION,WHICH IS THE OWNER OF THE <br /> 5 _11 APPROVAL. COPYRIGHT IN THIS WORK.THEY SHALL NOT <br /> I�� E. SIGNAGE CONTRACTOR TO INSTALL SIGNAGE IN BE REPRODUCED(IN WHOLE OR IN PART), <br /> 1) SHARED WITH THIRD PARTIES COMPLIANCE WITH LOCAL CODES AND OBTAIN PERMIT. IN ANY <br /> -- MANNER ON OTHER PROJEJE USEDCTS OR <br /> F. SIGNAGE CONTRACTOR TO SUPPLY SHOP DRAWINGS TO EXTENSIONS TO THIS PROJECT WITHOUT THE <br /> CONSTRUCTION MANAGER AND TO THE GENERAL PRIOR WRITTEN CONSENT OF STARBUCKS <br /> CONTRACTOR AS NEEDED.GENERAL CONTRACTOR TO CORPORATION.THESE DRAWINGS AND <br /> NOTIFY CONSTRUCTION MANAGER IMMEDIATELY IF SHOP SPECIFICATIONS ARE INTENDED TO EXPRESS <br /> DRAWINGS OR INSTALLATION IS IN DISCREPANCY WITH DESIGN INTENT FOR A PROTOTYPICAL <br /> ARCHITECTURAL DRAWINGS. STARBUCKS STORE(WHICH IS SUBJECT TO <br /> CHANGE AT ANYTIME)AND DO NOT REFLECT <br /> emolition ExteriorA G. GENERAL CONTRACTOR TO CLEAN,PATCH AND ACTUAL SITE CONDITIONS.NEITHER PARTY <br /> 1 REPAIR EXISTING EXTERIOR AS REQUIRED. SHALL HAVE ANY OBLIGATION NOR LIABILITY TO <br /> THE OTHER(EXCEPT STATED ABOVE)UNTIL A <br /> --- - WRITTEN AGREEMENT IS FULLY EXECUTED BY <br /> BOTH PARTIES. <br /> KEYED NOTES STARBUCKS TEMPLATE VERSION:12021.10.22 <br /> 1. BUILDING SIGNAGE TO BE CAREFULLY REMOVED AND ARCHITECT OF RECORD <br /> SURFACE REPAIRED AND PREPARED FOR FUTURE <br /> SIGNAGE PER A201 AND A202. _ GRAPHITE <br /> 2. AWNING TO BE CAREFULLY REMOVED AND SURFACE <br /> REPAIRED AS NEEDED. <br /> GRAPHITE DESIGN GROUP,LLC,ARCHITECTS <br /> 3. SEE DEMO PLAN D101 FOR PATIO FURNITURE. 1807 7TH AVENUE,SUITE 700 <br /> SEATTLE,WA 98101 <br /> 4. SIGN TO BE PRESERVED FOR RELOCATION PER A201. (206)224-3335 <br /> �0Ta °B ® N2�2_ _ n REPAIR SURFACE BELOW AS NEEDED. <br /> rp-pL—IYy—EtS�SF 1 - "�J 5. SEE DEMO SITE PLAN 13100 FOR SITE DEMO SCOPE. <br /> LTHRU�> 1 <br /> -_--- 2 _ _ — 9335 REGI <br /> I 2 MARTIN LEE HILL <br /> STATE OF WASHINGTON <br /> II � <br /> II <br /> x <br /> Demolition Exterior B 2 <br /> �J sui 3/18 ,o n Demolition Exterior D _ H <br /> Pula:3/18"=V o- _- O <br /> r � <br /> 06 Q N <br /> go <br /> to Q Q <br /> w w x <br /> zQ < m � <br /> w 0 L) 0 <br /> LU <br /> LLI <br /> 2_ s o w <br /> STORE#: 22817 <br /> PROJECT#: 60007-039 <br /> ISSUE DATE: 10/27/2023 <br /> DESIGN MANAGER: GRAPHITE <br /> PRODUCTION DESIGNER: GRAPHITE <br /> CHECKED BY: GRAPHITE <br /> II ii IOIII III Revision Schedule <br /> y II Rev Date B Description <br /> I��I 5 II jll Y � O II <br /> �N� IFS'I�I,I II II <br /> `-"- <br /> dl _ <br /> = IIII III <br /> =TITLE: EXTERIOR <br /> JDemolition Exterior C <br /> solo:3118"=1'4" <br /> SHEET NUMBER: <br /> D201 <br />