My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10531 29TH AVE SE 2024 Plans 2025-07-02
>
Address Records
>
29TH AVE SE
>
10531
>
Plans
>
10531 29TH AVE SE 2024 Plans 2025-07-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 7:08:45 AM
Creation date
6/16/2025 9:14:19 AM
Metadata
Fields
Template:
Address Document
Street Name
29TH AVE SE
Street Number
10531
Permit
PV2411-001
Year
2024
Notes
CASEY KOPP KW PV SOLAR PANEL INSTALLATION ON ROOF
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I I I *1� <br /> SUN i BLUE RAVEN <br /> SYSTEM BONDING & GROUNDING 9 SOLAR <br /> mr FRAME <br /> me_____ -__S-FM -MICRORAILTM INSTALLATION P A G-E <br /> -GUIDE- 'I- <br /> E-W BONDING PATH: <br /> E-W m odule to m odule bonding is accom plished <br /> with 2 pre-installed bonding pins which engage <br /> on the secure side of the M brorailTM and splice. <br /> I <br /> I <br /> Star Washer is W EEBLUG <br /> Single Use Only Single Use Only Alternate m Ethod <br /> N-S BONDING PATH: <br /> TERM NALTORQUE, N-S m odule to m odule bonding is <br /> Install Conductor and accom pushed with bonding clam pwith 2 integral <br /> torque to the following: TERM NALTORQUE, TERM NALTORQUE, bonding pins. (refer also to alternate m ethod) <br /> 4-6 AW Cc 35in-lbs Install Conductor and Install Conductor and <br /> 8 AW Q 25 in-lbs torque to the following: torque to the following: <br /> 10-14 AW Cc 20 in-lbs 4-14 AW Ck 35in-lbs 6-14 AW a 7ft-lbs <br /> LUG DETAIL & TORQUE INFO LUG DETAIL & TORQUE INFO LUG DETAIL & TORQUE INFO-� <br /> Rsco Lay-In Lug (GBL-4DBT) Ilsco Flange Lug (SGB-4) Wiley W EEBLug (6.7) <br /> • 10-32 m cunting hardware • 1 /4" m cunting hardware • 1 /4" m cunting hardware <br /> • T orque = 5 ft-lb • T orque = 75 in-lb • T orque = 10 ft-lb Alternate m Ethod <br /> • A W G4-14-Solid or Stranded • A W G4-14-Solid or Stranded • A W G6-14-Solid or Stranded <br /> TRIM PAIL BONDING PATH: <br /> NOTE: ISOLATE COPPER FROM ALUM NUM CONTACT TO PREVENT CORROSION Trim rail to m odule bonding is accom pushed with <br /> System bonding is accom dished through m adules.System grounding accom Aished by attaching bonding clam pwith integral bonding pin and <br /> a ground lug to any m adule at a location on the m adule specified by the m adule m mufacturer. bonding T-bolt. (refer also to alternate m shod) DRAWING NUMBER: <br /> SS <br />
The URL can be used to link to this page
Your browser does not support the video tag.