My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP86 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />No payment will be made for the rejected materials or the removal of the materials 1 <br />unless the Contractor requests that the rejected material be tested. If the Contractor 2 <br />elects to have the rejected material tested, a minimum of three representative samples 3 <br />will be obtained and tested. Acceptance of rejected material will be based on 4 <br />conformance with the nonstatistical acceptance Specification. If the CPF for the rejected 5 <br />material is less than 0.75, no payment will be made for the rejected material; in addition, 6 <br />the cost of sampling and testing shall be borne by the Contractor. If the CPF is greater 7 <br />than or equal to 0.75, the cost of sampling and testing will be borne by the Contracting 8 <br />Agency. If the material is rejected before placement and the CPF is greater than or equal 9 <br />to 0.75, compensation for the rejected material will be at a CPF of 0.75. If rejection 10 <br />occurs after placement and the CPF is greater than or equal to 0.75, compensation for 11 <br />the rejected material will be at the calculated CPF with an addition of 25 percent of the 12 <br />unit Contract price added for the cost of removal and disposal. 13 <br /> 14 <br />5-04.3(11)D Rejection - A Partial Sublot 15 <br />In addition to the random acceptance sampling and testing, the Engineer may also 16 <br />isolate from a normal sublot any material that is suspected of being defective in relative 17 <br />density, gradation or asphalt binder content. Such isolated material will not include an 18 <br />original sample location. A minimum of three random samples of the suspect material will 19 <br />be obtained and tested. The material will then be statistically evaluated as an 20 <br />independent lot in accordance with Section 1-06.2(2). 21 <br /> 22 <br />5-04.3(11)E Rejection - An Entire Sublot 23 <br />An entire sublot that is suspected of being defective may be rejected. When a sublot is 24 <br />rejected a minimum of two additional random samples from this sublot will be obtained. 25 <br />These additional samples and the original sublot will be evaluated as an independent lot 26 <br />in accordance with Section 1-06.2(2). 27 <br /> 28 <br />5-04.3(11)F Rejection - A Lot in Progress 29 <br />The Contractor shall shut down operations and shall not resume HMA placement until 30 <br />such time as the Engineer is satisfied that material conforming to the Specifications can 31 <br />be produced: 32 <br /> 33 <br />1. When the CPF of a lot in progress drops below 1.00 and the Contractor is taking 34 <br />no corrective action, or 35 <br />2. When the Pay Factor (PF) for any constituent of a lot in progress drops below 36 <br />0.95 and the Contractor is taking no corrective action, or 37 <br />3. When either the PF for any constituent or the CPF of a lot in progress is less than 38 <br />0.75. 39 <br /> 40 <br />5-04.3(11)G Rejection - An Entire Lot (Mixture or Compaction) 41 <br />An entire lot with a CPF of less than 0.75 will be rejected. 42 <br /> 43 <br />5-04.3(12) Joints 44 <br /> 45 <br />5-04.3(12)A HMA Joints 46 <br /> 47
The URL can be used to link to this page
Your browser does not support the video tag.