My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP85 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />HMA for preleveling shall be thoroughly compacted. HMA that is used to prelevel wheel 1 <br />ruts shall be compacted with a pneumatic tire roller unless otherwise approved by the 2 <br />Engineer. 3 <br /> 4 <br />5-04.3(10)D2 HMA Compaction Nonstatistical Evaluation – Acceptance Testing 5 <br />The location of the HMA compaction acceptance tests will be randomly selected by the 6 <br />Engineer from within each sublot, with one test per sublot. 7 <br /> 8 <br />5-04.3(10)D3 HMA Nonstatistical Compaction – Price Adjustments 9 <br />For each compaction lot with one or two sublots, having all sublots attain a relative 10 <br />density that is 92 percent of the reference maximum density the HMA shall be accepted 11 <br />at the unit Contract price with no further evaluation. When a sublot does not attain a 12 <br />relative density that is 92 percent of the reference maximum density, the lot shall be 13 <br />evaluated in accordance with Section 1-06.2 to determine the appropriate CPF. The 14 <br />maximum CPF shall be 1.00, however, lots with a calculated CPF in excess of 1.00 will 15 <br />be used to offset lots with CPF values below 1.00 but greater than 0.90. Lots with CPF 16 <br />lower than 0.90 will be evaluated for compliance per 5-04.3(11). Additional testing by 17 <br />either a nuclear moisture-density gauge or cores will be completed as required to provide 18 <br />a minimum of three tests for evaluation. 19 <br /> 20 <br />For compaction below the required 92%, a Non-Conforming Compaction Factor (NCCF) 21 <br />will be determined. The NCCF equals the algebraic difference of CPF minus 1.00 22 <br />multiplied by 40 percent. The Compaction Price Adjustment will be calculated as the 23 <br />product of CPF, the quantity of HMA in the compaction control lot in tons, and the unit 24 <br />Contract price per ton of mix. 25 <br /> 26 <br />5-04.3(11) Reject Work 27 <br /> 28 <br />5-04.3(11)A Reject Work General 29 <br />Work that is defective or does not conform to Contract requirements shall be rejected. 30 <br />The Contractor may propose, in writing, alternatives to removal and replacement of 31 <br />rejected material. Acceptability of such alternative proposals will be determined at the 32 <br />sole discretion of the Engineer. HMA that has been rejected is subject to the 33 <br />requirements in Section 1-06.2(2) and this specification, and the Contractor shall submit 34 <br />a corrective action proposal to the Engineer for approval. 35 <br /> 36 <br />5-04.3(11)B Rejection by Contractor 37 <br />The Contractor may, prior to sampling, elect to remove any defective material and 38 <br />replace it with new material. Any such new material will be sampled, tested, and 39 <br />evaluated for acceptance. 40 <br /> 41 <br />5-04.3(11)C Rejection Without Testing (Mixture or Compaction) 42 <br />The Engineer may, without sampling, reject any batch, load, or section of Roadway that 43 <br />appears defective. Material rejected before placement shall not be incorporated into the 44 <br />pavement. Any rejected section of Roadway shall be removed. 45 <br /> 46
The URL can be used to link to this page
Your browser does not support the video tag.