My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP91 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />c. Should closure of the intersection in its entirety be necessary, and no trolley 1 <br />service is impacted, keep such closure to the minimum time required to place 2 <br />and compact the HMA mixture, plane, remove asphalt, tack coat, and as 3 <br />needed. 4 <br /> 5 <br />d. Any work in an intersection requires advance warning in both signage and a 6 <br />number of Working Days advance notice as determined by the Engineer, to alert 7 <br />traffic and emergency services of the intersection closure or partial closure. 8 <br /> 9 <br />e. Allow new compacted HMA asphalt to cool to ambient temperature before 10 <br />any traffic is allowed on it. Traffic is not allowed on newly placed asphalt until 11 <br />approval has been obtained from the Engineer. 12 <br /> 13 <br />2. Temporary centerline marking, post-paving temporary marking, temporary stop 14 <br />bars, and maintaining temporary pavement marking must comply with Section 15 <br />8-23. 16 <br /> 17 <br />3. Permanent pavement marking must comply with Section 8-22. 18 <br /> 19 <br />5-04.3(14)B2 Submittals - Planing Plan and HMA Paving Plan 20 <br />The Contractor must submit a separate planing plan and a separate paving plan to the 21 <br />Engineer at least 5 Working Days in advance of each operation’s activity start date. 22 <br />These plans must show how the moving operation and traffic control are coordinated, as 23 <br />they will be discussed at the pre-planing briefing and pre-paving briefing. When 24 <br />requested by the Engineer, the Contractor must provide each operation’s traffic control 25 <br />plan on 24 x 36 inch or larger size Shop Drawings with a scale showing both the area of 26 <br />operation and sufficient detail of traffic beyond the area of operation where detour traffic 27 <br />may be required. The scale on the Shop Drawings is 1 inch = 20 feet, which may be 28 <br />changed if the Engineer agrees sufficient detail is shown. 29 <br /> 30 <br />The planing operation and the paving operation include, but are not limited to, metal 31 <br />detection, removal of asphalt and temporary asphalt of any kind, tack coat and drying, 32 <br />staging of supply trucks, paving trains, rolling, scheduling, and as may be discussed at 33 <br />the briefing. 34 <br /> 35 <br />When intersections will be partially or totally blocked, provide adequately sized and 36 <br />noticeable signage alerting traffic of closures to come, a minimum 2 Working Days in 37 <br />advance. The traffic control plan must show where police officers will be stationed when 38 <br />signalization is or may be, countermanded, and show areas where flaggers are 39 <br />proposed. 40 <br /> 41 <br />At a minimum, the planing and the paving plan must include: 42 <br /> 43 <br />1. A copy of the accepted traffic control plan, see Section 1-10.2(2), detailing each 44 <br />day’s traffic control as it relates to the specific requirements of that day’s planing 45 <br />and paving. Briefly describe the sequencing of traffic control consistent with the 46 <br />proposed planing and paving sequence, and scheduling of placement of 47
The URL can be used to link to this page
Your browser does not support the video tag.