My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP90 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> 1 <br />Sweeping of roadway surface shall immediately follow all grinding. Sweeping of roadway 2 <br />surface is required prior to tack placement and paving. 3 <br /> 4 <br />The road shall be overlayed within 3 working days after planing operation for streets 5 <br />without loops. On streets where loops will be replaced, the overlay shall be completed 6 <br />within 8 working days after planing operation. 7 <br /> 8 <br />Sweepers following the grinding work will not be paid separately, and is included in the 9 <br />bid item “Planing Bituminous Pavement (2” Deep)”, per square yard. 10 <br /> 11 <br />For mainline planing operations, the equipment shall have automatic controls, with 12 <br />sensors for either or both sides of the equipment. The controls shall be capable of 13 <br />sensing the proper grade from an outside reference line, or a mat-referencing device. 14 <br />The automatic controls shall also be capable of maintaining the desired transverse slope. 15 <br />The transverse slope controller shall be capable of maintaining the mandrel at the 16 <br />desired slope (expressed as a percentage) within plus or minus 0.1 percent. 17 <br /> 18 <br />Pre-level course is not anticipated on any of the selected streets. If, however, after 19 <br />plaining operations, drivability issues cannot be resolved with 2” overlay, pre-level will be 20 <br />required as directed and paid for by “HMA Class 1/2” PG 64-22”, per ton. Contractor is 21 <br />strongly encouraged to bid the work to cover their cost of pre-level operations. 22 <br /> *** 23 <br /> 24 <br />5-04.3(14)B Paving and Planing Under Traffic 25 <br /> 26 <br />5-04.3(14)B1 General 27 <br />In addition, the requirements of Section 1-07.23 and the traffic controls required in 28 <br />Section 1-10, and unless the Contract specifies otherwise or the Engineer approves, the 29 <br />Contractor must comply with the following: 30 <br /> 31 <br />1. Intersections: 32 <br /> 33 <br />a. Keep intersections open to traffic at all times, except when paving or planing 34 <br />operations through an intersection requires closure. Such closure must be kept 35 <br />to the minimum time required to place and compact the HMA mixture, or plane 36 <br />as appropriate. For paving, schedule such closure to individual lanes or portions 37 <br />thereof that allows the traffic volumes and schedule of traffic volumes required in 38 <br />the approved traffic control plan. Schedule work so that adjacent intersections 39 <br />are not impacted at the same time and comply with the traffic control restrictions 40 <br />required by the Traffic Engineer. Each individual intersection closure or partial 41 <br />closure must be addressed in the traffic control plan, which must be submitted to 42 <br />and accepted by the Engineer, see Section 1-10.2(2). 43 <br /> 44 <br />b. When planing or paving and related construction must occur in an 45 <br />intersection, consider scheduling and sequencing such work into quarters of the 46 <br />intersection, or half or more of an intersection with side street detours. Be 47 <br />prepared to sequence the work to individual lanes or portions thereof. 48 <br /> 49
The URL can be used to link to this page
Your browser does not support the video tag.