My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP93 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> 1 <br />1. General for both the Paving and Planing: 2 <br /> 3 <br />a. The actual times of starting and ending daily operations. 4 <br /> 5 <br />b. In intersections, how to break up the intersection, and address traffic control 6 <br />and signalization for that operation, including use of peace officers. 7 <br /> 8 <br />c. The sequencing and scheduling of paving operations and of planing operations, 9 <br />as applicable, as it relates to traffic control, public convenience and safety, and 10 <br />other Contractors who may operate in the Project limits. 11 <br /> 12 <br />d. Notifications required of Contractor activities and coordinating with other entities 13 <br />and the public as necessary. 14 <br /> 15 <br />e. Description of the sequencing of installation and types of temporary pavement 16 <br />markings as it relates to planning and paving. 17 <br /> 18 <br />f. Description of the sequencing of installation of, and the removal of, temporary 19 <br />pavement patch material around exposed castings and as may be needed. 20 <br /> 21 <br />g. Description of procedures and equipment to identify hidden metal in the 22 <br />pavement, such as survey monumentation, monitoring wells, streetcar rail, and 23 <br />castings, before planing as per Section 5-04.3(14)B2. 24 <br /> 25 <br />h. Description of how flaggers will be coordinated with the planing, paving, and 26 <br />related operations. 27 <br /> 28 <br />i. Description of sequencing of traffic controls for the process of rigid pavement 29 <br />base repairs. 30 <br /> 31 <br />j. Other items the Engineer deems necessary to address. 32 <br /> 33 <br />2. Paving – additional topics: 34 <br /> 35 <br />a. When to start applying tack and coordinating with paving. 36 <br /> 37 <br />b. Types of equipment and numbers of each type of equipment to be used. If 38 <br />more pieces of equipment than personnel are proposed, describe the 39 <br />sequencing of the personnel operating the types of equipment. Discuss the 40 <br />continuance of operator personnel for each type of equipment as it relates to 41 <br />meeting Specification requirements. 42 <br /> 43 <br />c. Number of JMFs to be placed, and if more than one JMF is used, how the 44 <br />Contractor will ensure different JMFs are distinguished, how pavers and how 45
The URL can be used to link to this page
Your browser does not support the video tag.