My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP94 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />MTVs are distinguished, and how pavers and MTVs are cleaned so that one 1 <br />JMF does not adversely influence the other JMF. 2 <br /> 3 <br />d. Description of contingency plans for that day’s operations such as equipment 4 <br />breakdown, rain out, and supplier shutdown of operations. 5 <br /> 6 <br />e. Number of sublots to be placed, sequencing of density testing, and other 7 <br />sampling and testing. 8 <br /> 9 <br />5-04.3(15) Sealing Pavement Surfaces 10 <br />Apply a fog seal where shown in the plans. Construct the fog seal in accordance with 11 <br />Section 5-02.3. Unless otherwise approved by the Engineer, apply the fog seal prior to 12 <br />opening to traffic. 13 <br /> 14 <br />5-04.3(16) HMA Road Approaches 15 <br />Construct HMA approaches at the locations shown in the Plans or where staked by the 16 <br />Engineer, in accordance with Section 5-04. 17 <br /> 18 <br />5-04.4 Measurement 19 <br />HMA Cl. ___ PG ___, HMA for ___ Cl. ___ PG ___, and Commercial HMA will 20 <br />be measured by the ton in accordance with Section 1-09.2, with no deduction being 21 <br />made for the weight of asphalt binder, mineral filler, or any other component of the 22 <br />mixture. If the Contractor elects to remove and replace mix as allowed by Section 5-23 <br />04.3(11), the material removed will not be measured. 24 <br /> 25 <br />Roadway cores will be measured per each for the number of cores taken. 26 <br /> 27 <br />Pavement repair excavation will be measured by the square yard of surface marked prior 28 <br />to excavation. 29 <br /> 30 <br />Planing bituminous pavement will be measured by the square yard. 31 <br /> 32 <br />5-04.5 Payment 33 <br />Payment will be made for each of the following Bid items that are included in the 34 <br />Proposal: 35 <br /> 36 <br />“HMA Cl. ___ PG ___”, per ton. 37 <br /> 38 <br />“HMA for Approach Cl. ___ PG ___”, per ton. 39 <br /> 40 <br />“HMA for Preleveling Cl. ___ PG ___”, per ton. 41 <br /> 42 <br />“HMA for Pavement Repair Cl. ___ PG ___”, per ton. 43 <br /> 44 <br />“Commercial HMA”, per ton. 45
The URL can be used to link to this page
Your browser does not support the video tag.