My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP95 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> 1 <br />The unit Contract price per ton for “HMA Cl. ___ PG ___”, “HMA for Approach Cl. 2 <br />___ PG ___”, “HMA for Preleveling Cl. ___ PG ___”, “HMA for Pavement Repair Cl. 3 <br />___ PG ___”, and “Commercial HMA” shall be full compensation for all costs, 4 <br />including anti-stripping additive, incurred to carry out the requirements of Section 5-5 <br />04 except for those costs included in other items which are included in this 6 <br />Subsection and which are included in the Proposal. 7 <br /> 8 <br /> 9 <br />“Pavement Repair Excavation Incl. Haul”, per square yard. 10 <br /> 11 <br />The unit Contract price per square yard for “Pavement Repair Excavation Incl. Haul” 12 <br />shall be full payment for all costs incurred to perform the Work described in Section 13 <br />5-04.3(4) with the exception, however, that all costs involved in the placement of 14 <br />HMA shall be included in the unit Contract price per ton for “HMA for Pavement 15 <br />Repair Cl. ___ PG ___”, per ton. 16 <br /> 17 <br />“Asphalt for Prime Coat”, per ton. 18 <br /> 19 <br />The unit Contract price per ton for “Asphalt for Prime Coat” shall be full payment for 20 <br />all costs incurred to obtain, provide and install the material in accordance with 21 <br />Section 5-04.3(4). 22 <br /> 23 <br />“Prime Coat Agg.”, per cubic yard, or per ton. 24 <br /> 25 <br />The unit Contract price per cubic yard or per ton for “Prime Coat Agg.” shall be full 26 <br />pay for furnishing, loading, and hauling aggregate to the place of deposit and 27 <br />spreading the aggregate in the quantities required by the Engineer. 28 <br /> 29 <br />“Planing Bituminous Pavement ***(2” Deep)***”, per square yard. 30 <br /> 31 <br />The unit Contract price per square yard for “Planing Bituminous Pavement” shall be 32 <br />full payment for all costs incurred to perform the Work described in Section 5-33 <br />04.3(14). 34 <br /> 35 <br />“Job Mix Compliance Price Adjustment”, by calculation. 36 <br /> 37 <br />“Job Mix Compliance Price Adjustment” will be calculated and paid for as described 38 <br />in Section 5-04.3(9)C6. 39 <br /> 40 <br />“Compaction Price Adjustment”, by calculation. 41 <br /> 42 <br />“Compaction Price Adjustment” will be calculated and paid for as described in 43 <br />Section 5-04.3(10)D3. 44 <br /> 45 <br />“Roadway Core”, per each. 46
The URL can be used to link to this page
Your browser does not support the video tag.