My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP114 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />Input Voltage 12-60V DC <br />Power Consumption max 9.6W, 400mA@24 VDC <br />Operating Temperature Range -34°C to +74°C / -29.2°F to +165.2°F <br />(Continuous Operation) <br />NEMA TS 2 Environmental testing by IAW <br />w/Section 2.1 of NEMA TS 2-2003 and <br />either meets or exceeds those <br />requirements in the following <br />categories: Operating Voltage, <br />Operating Frequency, Ambient <br />Temperature, Humidity, Vibration and <br />Shock <br />Enclosure Rating IP-68 – IP 67 Connector <br />Weight <br /> <br />1.5kg/3.3lbs (bracket, sunshield, <br />housing sensor and video detection <br />module) <br />Dimensions 9.8” x 6.3” x 4.7” (w/mounting bracket) <br /> 1 <br /> 2 <br />Video detections shall be in place and functioning prior to disabling the associated 3 <br />loop detectors. 4 <br /> 5 <br /> 6 <br /> 7 <br />9-29.18(3)B Permanent Video detection 8 <br /> 9 <br />A permanent video detection system shall be required at the following locations 10 <br />during construction: 11 <br /> 12 <br />*** 13 <br /> 14 <br /> 15 <br />None 16 <br /> 17 <br /> 18 <br /> 19 <br />*** 20 <br /> 21 <br />The permanent thermal detection system shall be installed on the signal mast 22 <br />arm on a 6’ long camera mount bracket at a location directed by the Engineer, 23 <br />as close as practical to the end of the mast arm. The video detection cable shall 24 <br />be installed in the mast arm per manufacturers recommendations. Any coiled 25 <br />slack cable shall be mounted to the camera mount bracket at the back of the 26 <br />pole. In the signal control cabinet, a video detection module shall be installed, 27 <br />along with a surge protector and 4x6 fuse kit assembly. Video detection cable 28 <br />hall be connectorized and all cables terminated to complete the system. City of 29
The URL can be used to link to this page
Your browser does not support the video tag.