My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD GLENWOOD AVE TO DOGWOOD DR <br />1 OF 2 BID SCHEDULE <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the <br />unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform <br />thereto. All entries must be typed or entered in ink. <br />BID SCHEDULE <br />BIDDER:___________________________ <br />Item <br />No.ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />W Mukilteo Blvd Glenwood Ave to Dogwood Dr <br /> <br />1 Mobilization LS 1 $_______.___$______________.___ <br />2 Flaggers (Min. Bid Prevailing Wage)Hour 1,985 $_______.___$______________.___ <br />3 Contractor Provided Uniformed Police Officer Hour 280 $_______.___$______________.___ <br />4 Traffic Control Supervisor LS 1 $_______.___$______________.___ <br />5 Other Traffic Control Labor Hour 120 $_______.___$______________.___ <br />6 Construction Signs Class A SF 160 $_______.___$______________.___ <br />7 Sequential Arrow Sign Hour 200 $_______.___$______________.___ <br />8 Portable Changeable Message Sign HR 1,318 $_______.___$______________.___ <br />9 Other Temporary Traffic Control Devices LS 1 $_______.___$______________.___ <br />10 Planing Bituminous Pavement SY 22,799 $_______.___$______________.___ <br />11 Additional Planing Bituminous Pavement SY 3,420 $_______.___$______________.___ <br />12 HMA CL ‰ Inch, PG 64-22 Ton 2,794 $_______.___$______________.___ <br />13 Street Cleaning Hour 70 $_______.___$______________.___ <br />14 Adjust Manhole Each 7 $_______.___$______________.___ <br />15 Adjust Catch Basin/Inlet to Grade Each 16 $_______.___$______________.___ <br />16 Adjust Valve Box to Grade Each 8 $_______.___$______________.___ <br />17 Adjust Existing Monument Castings to Grade Each 3 $_______.___$______________.___ <br />18 Plastic Wide Line LF 9,750 $_______.___$______________.___ <br />19 Plastic Traffic Arrow Each 13 $_______.___$______________.___
The URL can be used to link to this page
Your browser does not support the video tag.