Laserfiche WebLink
2025 FEDERAL OVERLAY, W MUKILTEO BLVD GLENWOOD AVE TO DOGWOOD DR <br />2 OF 2 BID SCHEDULE <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />Item <br />No.ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />20 24 Plastic Crosswalk Line SF 720 $_______.___$______________.___ <br />21 24 Plastic Stop Line LF 100 $_______.___$______________.___ <br />22 Plastic Line LF 11,410 $_______.___$______________.___ <br />23 Plastic Bicycle Lane Symbol Each 4 $_______.___$______________.___ <br />24 Plastic Bicycle Detector Symbol Each 1 $_______.___$______________.___ <br />25 Raised Pavement Markers, Type 2 Hund.2 $_______.___$______________.___ <br />26 Temporary Pavement Markings LF 26,060 $_______.___$______________.___ <br />27 <br />Remove and Replace Cement Conc. Sidewalk <br />and Type A-1 Curb and Gutter SY 6 $_______.___$______________.___ <br />28 Vehicle Loop Detectors LF 1,600 $_______.___$______________.___ <br />29 Loop Lead-In Detector Cable LF 150 $_______.___$______________.___ <br />30 Conduit Pipe, 2 Diameter LF 30 $_______.___$______________.___ <br />31 Replace Junction Box Each 1 $_______.___$______________.___ <br />32 Spill Prevention Control Plan LS 1 $_______.___$______________.___ <br />33 Resolve Above Ground Conflicts FA 1 $ 5,000.00 $ 5,000.00 <br />34 Erosion/Water Pollution Control LS 1 $_______.___$______________.___ <br />35 Asphalt Cost Price Adjustment Calc.1 $ 2,800.00 $ 2,800.00 <br />36 Minor Change FA 1 $ 25,000.00 $ 25,000.00 <br />Total Bid Amount $______________.___