My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP7 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />A bid by a partnership shall be executed in the partnership name and signed by a 1 <br />partner. A copy of the partnership agreement shall be submitted with the Bid Form if any 2 <br />DBE requirements are to be satisfied through such an agreement. 3 <br /> 4 <br />A bid by a joint venture shall be executed in the joint venture name and signed by a 5 <br />member of the joint venture. A copy of the joint venture agreement shall be submitted 6 <br />with the Bid Form if any DBE requirements are to be satisfied through such an 7 <br />agreement. 8 <br /> 9 <br />The Bidder shall submit with the Bid the following: 10 <br />1) Disadvantaged Business Enterprise Utilization Certification (WSDOT Form 272-056) 11 <br />2) DBE Written Confirmation Form (WSDOT Form 422-031) - For each and every DBE 12 <br />firm listed on the Bidder’s completed Disadvantaged Business Enterprise Utilization 13 <br />Certification, the Bidder shall submit written confirmation from that DBE firm that the 14 <br />DBE is in agreement with the DBE participation commitment that the Bidder has 15 <br />made in the Bidder’s completed Disadvantaged Business Enterprise Utilization 16 <br />Certification. 17 <br />3) Good Faith Effort Documentation - Bidder must submit good faith effort 18 <br />documentation with the Disadvantaged Business Enterprise Utilization Certification 19 <br />ONLY In the Event the bidder’s efforts to solicit sufficient DBE participation have been 20 <br />unsuccessful. 21 <br />4) DBE Item Breakdown (WSDOT Form 272-054) The Bidder shall submit a DBE Item 22 <br />Breakdown form defining the scope of work to be performed by each DBE listed on 23 <br />the DBE Utilization Certification. 24 <br />Directions for delivery of the Disadvantaged Business Enterprise, Written Confirmation 25 <br />Documents, and Disadvantaged Business Enterprise Good Faith Effort documentation are 26 <br />included in Sections 1-02.9 and 1-02.10. 27 <br /> 28 <br />1-02.6.OptionC.RTF 29 <br />Subcontractor’s List 30 <br />(November 25, 2024 APWA GSP 1-02.6, Option C) 31 <br />The fourth paragraph of Section 1-02.6 is revised to read: 32 <br /> 33 <br />The Bidder shall submit with the Bid the completed Subcontractor List included in the 34 <br />Contracting Agency Proposal Package. If a Subcontractor List Form is not included in 35 <br />the package, use DOT Form 271-015A. The Form shall contain the following: 36 <br /> 37 <br />1. Subcontractors who will perform the work of structural steel installation, rebar 38 <br />installation, heating, ventilation, air conditioning, and plumbing as described in 39 <br />RCW 18.106 and electrical as described in RCW 19.28, 40 <br />2. The Work those subcontractors will perform on the Contract as described in 41 <br />RCW 39.30.060; and 42 <br />3. No more than one subcontractor for each category of work identified, except, 43 <br />when subcontractors vary with Bid alternates, in which case the Bidder shall 44 <br />identify which subcontractor will be used for which alternate. 45 <br /> 46 <br />1-02.6(1).RTF 47 <br />Add the following new section: 48
The URL can be used to link to this page
Your browser does not support the video tag.