My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP9 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />· DBE Bid Item Breakdown (WSDOT 272-054) 1 <br /> 2 <br />Proposals that are received as required will be publicly opened and read as specified in 3 <br />Section 1-02.12. The Contracting Agency will not open or consider any Bid Proposal that 4 <br />is received after the time specified in the Call for Bids for receipt of Bid Proposals or 5 <br />received in a location other than that specified in the Call for Bids. The Contracting 6 <br />Agency will not open or consider any “Supplemental Information” (Written Confirmations 7 <br />Documents, or GFE Documentation) that is received after the time specified, or received 8 <br />in a location other than that specified in the Call for Bids. 9 <br /> 10 <br />If an emergency or unanticipated event interrupts normal work processes of the 11 <br />Contracting Agency so that Proposals cannot be received at the office designated for 12 <br />receipt of bids as specified in Section 1-02.12 the time specified for receipt of the 13 <br />Proposal will be deemed to be extended to the same time of day specified in the 14 <br />solicitation on the first work day on which the normal work processes of the Contracting 15 <br />Agency resume. 16 <br /> 17 <br />Supplemental bid information submitted after the Proposal submittal but within 48 hours 18 <br />of the time specified for receipt of Proposals, shall be submitted in a sealed envelope 19 <br />labeled the same as for the Proposal, with “Supplemental Information” added. 20 <br /> 21 <br />DBE Utilization Certification (WSDOT Form 272-056) 22 <br />The DBE Utilization Certification shall be received at the same location and no later than 23 <br />the time required for delivery of the Proposal. The Contracting Agency will not open or 24 <br />consider any Proposal when the DBE Utilization Certification is received after the time 25 <br />specified for receipt of Proposals or received in a location other than that specified for 26 <br />receipt of Proposals. The DBE Utilization Certification may be submitted in the same 27 <br />envelope as the Bid deposit. 28 <br /> 29 <br />DBE Written Confirmation Document (WSDOT Form 422-031) and/or GFE 30 <br />Documentation, (if applicable) 31 <br />The DBE Written Confirmation Documents and/or GFE Documentation are not required 32 <br />to be submitted with the Proposal. The DBE Written Confirmation Document(s) and/or 33 <br />GFE Documentation (if applicable) shall be received either with the Bid Proposal or as a 34 <br />Supplement to the Bid. Written Confirmation and/or GFE Documentation shall be 35 <br />received no later than 48 hours (not including Saturdays, Sundays and Holidays) after 36 <br />the time for delivery of the Proposal. To be considered responsive, Bidders shall submit 37 <br />a Written Confirmation Document from each DBE firm listed on the Bidder’s completed 38 <br />DBE Utilization Certification and/or the GFE Documentation as required by Section 1-39 <br />02.6. 40 <br /> 41 <br />DBE Bid Item Breakdown Form (WSDOT Form 272-054) 42 <br />The DBE Bid Item Breakdown shall be received either with the Bid Proposal or as a 43 <br />Supplement to the Bid. The documents shall be received no later than 48 hours (not 44 <br />including Saturdays, Sundays and Holidays) after the time for delivery of the Proposal. To 45 <br />be considered responsive, Bidders shall submit a completed DBE Bid Item Breakdown, 46 <br />however, the Contractor may correct minor errors to the DBE Bid Item Breakdown for a 47 <br />period up to five calendar days after bid opening (not including Saturdays, Sundays and 48 <br />Holidays). DBE Bid Item Breakdowns that are still incorrect after the correction period will 49 <br />be determined to be non-responsive. 50 <br /> 51 <br />The DBE Bid Item Breakdown will not be included as part of the executed Contract. 52
The URL can be used to link to this page
Your browser does not support the video tag.