My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP17 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />The rights exercised under the provisions of this section shall not diminish the 1 <br />Contracting Agency’s right to pursue any other avenue for additional remedy or damages 2 <br />with respect to the Contractor’s failure to perform the work as required. 3 <br /> 4 <br /> 5 <br />1-05.11.RTF 6 <br />1-05.11 Final Inspection 7 <br /> 8 <br />Delete this section and replace it with the following: 9 <br /> 10 <br />1-05.11 Final Inspections and Operational Testing 11 <br />(October 1, 2005 APWA GSP) 12 <br /> 13 <br />1-05.11(1) Substantial Completion Date 14 <br /> 15 <br />When the Contractor considers the work to be substantially complete, the Contractor 16 <br />shall so notify the Engineer and request the Engineer establish the Substantial 17 <br />Completion Date. The Contractor’s request shall list the specific items of work that 18 <br />remain to be completed in order to reach physical completion. The Engineer will 19 <br />schedule an inspection of the work with the Contractor to determine the status of 20 <br />completion. The Engineer may also establish the Substantial Completion Date 21 <br />unilaterally. 22 <br /> 23 <br />If, after this inspection, the Engineer concurs with the Contractor that the work is 24 <br />substantially complete and ready for its intended use, the Engineer, by written notice to 25 <br />the Contractor, will set the Substantial Completion Date. If, after this inspection the 26 <br />Engineer does not consider the work substantially complete and ready for its intended 27 <br />use, the Engineer will, by written notice, so notify the Contractor giving the reasons 28 <br />therefor. 29 <br /> 30 <br />Upon receipt of written notice concurring in or denying substantial completion, whichever 31 <br />is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized 32 <br />interruption, the work necessary to reach Substantial and Physical Completion. The 33 <br />Contractor shall provide the Engineer with a revised schedule indicating when the 34 <br />Contractor expects to reach substantial and physical completion of the work. 35 <br /> 36 <br />The above process shall be repeated until the Engineer establishes the Substantial 37 <br />Completion Date and the Contractor considers the work physically complete and ready for 38 <br />final inspection. 39 <br /> 40 <br />1-05.11(2) Final Inspection and Physical Completion Date 41 <br /> 42 <br />When the Contractor considers the work physically complete and ready for final 43 <br />inspection, the Contractor by written notice, shall request the Engineer to schedule a 44 <br />final inspection. The Engineer will set a date for final inspection. The Engineer and the 45 <br />Contractor will then make a final inspection and the Engineer will notify the Contractor in 46 <br />writing of all particulars in which the final inspection reveals the work incomplete or 47 <br />unacceptable. The Contractor shall immediately take such corrective measures as are 48 <br />necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, 49 <br />diligently, and without interruption until physical completion of the listed deficiencies. This 50 <br />process will continue until the Engineer is satisfied the listed deficiencies have been 51 <br />corrected. 52
The URL can be used to link to this page
Your browser does not support the video tag.