My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP18 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> 1 <br />If action to correct the listed deficiencies is not initiated within 7 days after receipt of the 2 <br />written notice listing the deficiencies, the Engineer may, upon written notice to the 3 <br />Contractor, take whatever steps are necessary to correct those deficiencies pursuant to 4 <br />Section 1-05.7. 5 <br />The Contractor will not be allowed an extension of contract time because of a delay in 6 <br />the performance of the work attributable to the exercise of the Engineer’s right 7 <br />hereunder. 8 <br /> 9 <br />Upon correction of all deficiencies, the Engineer will notify the Contractor and the 10 <br />Contracting Agency, in writing, of the date upon which the work was considered physically 11 <br />complete. That date shall constitute the Physical Completion Date of the contract, but shall 12 <br />not imply acceptance of the work or that all the obligations of the Contractor under the 13 <br />contract have been fulfilled. 14 <br /> 15 <br />1-05.11(3) Operational Testing 16 <br /> 17 <br />It is the intent of the Contracting Agency to have at the Physical Completion Date a 18 <br />complete and operable system. Therefore when the work involves the installation of 19 <br />machinery or other mechanical equipment; street lighting, electrical distribution or signal 20 <br />systems; irrigation systems; buildings; or other similar work it may be desirable for the 21 <br />Engineer to have the Contractor operate and test the work for a period of time after final 22 <br />inspection but prior to the physical completion date. Whenever items of work are listed in 23 <br />the Contract Provisions for operational testing they shall be fully tested under operating 24 <br />conditions for the time period specified to ensure their acceptability prior to the Physical 25 <br />Completion Date. During and following the test period, the Contractor shall correct any 26 <br />items of workmanship, materials, or equipment which prove faulty, or that are not in first 27 <br />class operating condition. Equipment, electrical controls, meters, or other devices and 28 <br />equipment to be tested during this period shall be tested under the observation of the 29 <br />Engineer, so that the Engineer may determine their suitability for the purpose for which 30 <br />they were installed. The Physical Completion Date cannot be established until testing 31 <br />and corrections have been completed to the satisfaction of the Engineer. 32 <br /> 33 <br />The costs for power, gas, labor, material, supplies, and everything else needed to 34 <br />successfully complete operational testing, shall be included in the unit contract prices 35 <br />related to the system being tested, unless specifically set forth otherwise in the proposal. 36 <br /> 37 <br />Operational and test periods, when required by the Engineer, shall not affect a 38 <br />manufacturer’s guaranties or warranties furnished under the terms of the contract. 39 <br /> 40 <br /> 41 <br />1-05.13.RTF 42 <br />1-05.13 Superintendents, Labor, and Equipment of Contractor 43 <br />(August 14, 2013 APWA GSP) 44 <br /> 45 <br />Delete the sixth and seventh paragraphs of this section. 46 <br /> 47 <br />1-05.15.RTF 48 <br />1-05.15 Method of Serving Notices 49 <br />(January 4, 2024 APWA GSP) 50 <br /> 51 <br />Revise the second paragraph to read: 52
The URL can be used to link to this page
Your browser does not support the video tag.