Laserfiche WebLink
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP65 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />All costs as authorized by the Engineer will be paid for by force account as specified 1 <br />in Section 1-09.6. 2 <br /> 3 <br />For purpose of providing a common proposal for all bidders, the Contracting Agency 4 <br />has entered an amount for the item “Work Zone Safety Contingency” in the Proposal 5 <br />to become a part of the Contractor’s total bid. 6 <br /> 7 <br />The Engineer may choose to use existing bid items for the implementation of the 8 <br />agreed upon enhancement. 9 <br /> 10 <br />1-10.5(2).OptionB.RTF 11 <br />1-10.5(2) Item Bids with Lump Sum for Incidentals 12 <br />(November 25, 2024, APWA GSP, Option B) 13 <br /> 14 <br />Section 1-10.5(2) is supplemented with the following: 15 <br /> 16 <br />“Uniformed Police Officer”, per hour 17 <br /> 18 <br />The unit contract price for “Uniformed Police Officer”, when applied to the number of 19 <br />units measured for this item in accordance with Section 1-10.4(2), shall be full 20 <br />compensation for all costs incurred by the Contractor in performing the Contract Work 21 <br />defined in Section 1-10.3(1)B of these Special Provisions, including all costs for 22 <br />arrangement for and supervision of uniformed law enforcement personnel and vehicles 23 <br />to participate in the Contractor’s traffic control activities. 24 <br /> 25 <br />END DIVISION1.RTF 26 <br />END DIVISION 1 27 <br /> 28