My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP73 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />a. A mechanical sampling device attached to the HMA plant. 1 <br /> 2 <br />b. Platforms or devices to enable sampling from the hauling vehicle without 3 <br />entering the hauling vehicle. 4 <br /> 5 <br />5-04.3(3)B Hauling Equipment 6 <br />Trucks used for hauling HMA shall have tight, clean, smooth metal beds and shall have a 7 <br />cover of canvas or other suitable material of sufficient size to protect the mixture from 8 <br />adverse weather. Whenever the weather conditions during the work shift include, or are 9 <br />forecast to include precipitation or an air temperature less than 45°F or when time from 10 <br />loading to unloading exceeds 30 minutes, the cover shall be securely attached to protect 11 <br />the HMA. 12 <br /> 13 <br />The Contractor shall provide an environmentally benign means to prevent the HMA 14 <br />mixture from adhering to the hauling equipment. Excess release agent shall be drained 15 <br />prior to filling hauling equipment with HMA. Petroleum derivatives or other coating 16 <br />material that contaminate or alter the characteristics of the HMA shall not be used. For 17 <br />live bed trucks, the conveyer shall be in operation during the process of applying the 18 <br />release agent. 19 <br /> 20 <br />5-04.3(3)C Pavers 21 <br />HMA pavers shall be self-contained, power-propelled units, provided with an internally 22 <br />heated vibratory screed and shall be capable of spreading and finishing courses of HMA 23 <br />plant mix material in lane widths required by the paving section shown in the Plans. 24 <br /> 25 <br />The HMA paver shall be in good condition and shall have the most current equipment 26 <br />available from the manufacturer for the prevention of segregation of the HMA mixture 27 <br />installed, in good condition, and in working order. The equipment certification shall list 28 <br />the make, model, and year of the paver and any equipment that has been retrofitted. 29 <br /> 30 <br />The screed shall be operated in accordance with the manufacturer’s recommendations 31 <br />and shall effectively produce a finished surface of the required evenness and texture 32 <br />without tearing, shoving, segregating, or gouging the mixture. A copy of the 33 <br />manufacturer’s recommendations shall be provided upon request by the Contracting 34 <br />Agency. Extensions will be allowed provided they produce the same results, including 35 <br />ride, density, and surface texture as obtained by the primary screed. Extensions without 36 <br />augers and an internally heated vibratory screed shall not be used in the Traveled Way. 37 <br /> 38 <br />When specified in the Contract, reference lines for vertical control will be required. Lines 39 <br />shall be placed on both outer edges of the Traveled Way of each Roadway. Horizontal 40 <br />control utilizing the reference line will be permitted. The grade and slope for intermediate 41 <br />lanes shall be controlled automatically from reference lines or by means of a mat 42 <br />referencing device and a slope control device. When the finish of the grade prepared for 43 <br />paving is superior to the established tolerances and when, in the opinion of the Engineer, 44 <br />further improvement to the line, grade, cross-section, and smoothness can best be 45 <br />achieved without the use of the reference line, a mat referencing device may be 46 <br />substituted for the reference line. Substitution of the device will be subject to the 47 <br />continued approval of the Engineer. A joint matcher may be used subject to the approval 48
The URL can be used to link to this page
Your browser does not support the video tag.