My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP74 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />of the Engineer. The reference line may be removed after the completion of the first 1 <br />course of HMA when approved by the Engineer. Whenever the Engineer determines that 2 <br />any of these methods are failing to provide the necessary vertical control, the reference 3 <br />lines will be reinstalled by the Contractor. 4 <br /> 5 <br />The Contractor shall furnish and install all pins, brackets, tensioning devices, wire, and 6 <br />accessories necessary for satisfactory operation of the automatic control equipment. 7 <br /> 8 <br />If the paving machine in use is not providing the required finish, the Engineer may 9 <br />suspend Work as allowed by Section 1-08.6. Any cleaning or solvent type liquids spilled 10 <br />on the pavement shall be thoroughly removed before paving proceeds. 11 <br /> 12 <br />5-04.3(3)D Material Transfer Device or Material Transfer Vehicle 13 <br />A Material Transfer Device/Vehicle (MTD/V) shall only be used with the Engineer’s 14 <br />approval, unless otherwise required by the Contract. 15 <br /> 16 <br />Where an MTD/V is required by the Contract, the Engineer may approve paving without 17 <br />an MTD/V, at the request of the Contractor. The Engineer will determine if an equitable 18 <br />adjustment in cost or time is due. 19 <br /> 20 <br />When used, the MTD/V shall mix the HMA after delivery by the hauling equipment and 21 <br />prior to laydown by the paving machine. Mixing of the HMA shall be sufficient to obtain a 22 <br />uniform temperature throughout the mixture. If a windrow elevator is used, the length of 23 <br />the windrow may be limited in urban areas or through intersections, at the discretion of 24 <br />the Engineer. 25 <br /> 26 <br />To be approved for use, an MTV: 27 <br /> 28 <br />1. Shall be self-propelled vehicle, separate from the hauling vehicle or paver. 29 <br /> 30 <br />2. Shall not be connected to the hauling vehicle or paver. 31 <br /> 32 <br />3. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. 33 <br /> 34 <br />4. Shall mix the HMA after delivery by the hauling equipment and prior to 35 <br />placement into the paving machine. 36 <br /> 37 <br />5. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the 38 <br />mixture. 39 <br /> 40 <br />To be approved for use, an MTD: 41 <br /> 42 <br />1. Shall be positively connected to the paver. 43 <br /> 44 <br />2. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. 45
The URL can be used to link to this page
Your browser does not support the video tag.