My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP76 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />applied to all joints. For Roadways open to traffic, the application of tack coat shall be 1 <br />limited to surfaces that will be paved during the same working shift. The spreading 2 <br />equipment shall be equipped with a thermometer to indicate the temperature of the tack 3 <br />coat material. 4 <br /> 5 <br />Equipment shall not operate on tacked surfaces until the tack has broken and cured. If 6 <br />the Contractor’s operation damages the tack coat it shall be repaired prior to placement 7 <br />of the HMA. 8 <br /> 9 <br />The tack coat shall be CSS-1, or CSS-1h emulsified asphalt. The CSS-1 and CSS-1h 10 <br />emulsified asphalt may be diluted once with water at a rate not to exceed one-part water 11 <br />to one-part emulsified asphalt. The tack coat shall have sufficient temperature such that 12 <br />it may be applied uniformly at the specified rate of application and shall not exceed the 13 <br />maximum temperature recommended by the emulsified asphalt manufacturer. 14 <br /> 15 <br />5-04.3(4)A Crack Sealing 16 <br />When the Proposal includes a pay item for crack sealing, seal cracks in accordance with 17 <br />Section 5-03. 18 <br /> 19 <br />5-04.3(4)B Vacant 20 <br /> 21 <br />5-04.3(4)C Pavement Repair 22 <br />The Contractor shall excavate pavement repair areas and shall backfill these with HMA 23 <br />in accordance with the details shown in the Plans and as marked in the field. The 24 <br />Contractor shall conduct the excavation operations in a manner that will protect the 25 <br />pavement that is to remain. Pavement not designated to be removed that is damaged as 26 <br />a result of the Contractor’s operations shall be repaired by the Contractor to the 27 <br />satisfaction of the Engineer at no cost to the Contracting Agency. The Contractor shall 28 <br />excavate only within one lane at a time unless approved otherwise by the Engineer. The 29 <br />Contractor shall not excavate more area than can be completely finished during the 30 <br />same shift, unless approved by the Engineer. 31 <br /> 32 <br />Unless otherwise shown in the Plans or determined by the Engineer, excavate to a depth 33 <br />of 1.0 feet. The Engineer will make the final determination of the excavation depth 34 <br />required. The minimum width of any pavement repair area shall be 40 inches unless 35 <br />shown otherwise in the Plans. Before any excavation, the existing pavement shall be 36 <br />sawcut or shall be removed by a pavement grinder. Excavated materials will become the 37 <br />property of the Contractor and shall be disposed of in a Contractor-provided site off the 38 <br />Right of Way or used in accordance with Sections 2-02.3(3) or 9-03.21. 39 <br /> 40 <br />Asphalt for tack coat shall be required as specified in Section 5-04.3(4). A heavy 41 <br />application of tack coat shall be applied to all surfaces of existing pavement in the 42 <br />pavement repair area. 43 <br /> 44 <br />Placement of the HMA backfill shall be accomplished in lifts not to exceed 0.35-foot 45 <br />compacted depth. Lifts that exceed 0.35-foot of compacted depth may be accomplished 46 <br />with the approval of the Engineer. Each lift shall be thoroughly compacted by a 47 <br />mechanical tamper or a roller. 48
The URL can be used to link to this page
Your browser does not support the video tag.