My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP75 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> 1 <br />3. Shall mix the HMA after delivery by the hauling equipment and prior to 2 <br />placement into the paving machine. 3 <br /> 4 <br />4. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the 5 <br />mixture. 6 <br /> 7 <br />5-04.3(3)E Rollers 8 <br />Rollers shall be of the steel wheel, vibratory, oscillatory, or pneumatic tire type, in good 9 <br />condition and capable of reversing without backlash. Operation of the roller shall be in 10 <br />accordance with the manufacturer’s recommendations. When ordered by the Engineer 11 <br />for any roller planned for use on the project, the Contractor shall provide a copy of the 12 <br />manufacturer’s recommendation for the use of that roller for compaction of HMA. The 13 <br />number and weight of rollers shall be sufficient to compact the mixture in compliance 14 <br />with the requirements of Section 5-04.3(10). The use of equipment that results in 15 <br />crushing of the aggregate will not be permitted. Rollers producing pickup, washboard, 16 <br />uneven compaction of the surface, displacement of the mixture or other undesirable 17 <br />results shall not be used. 18 <br /> 19 <br />5-04.3(4) Preparation of Existing Paved Surfaces 20 <br />When the surface of the existing pavement or old base is irregular, the Contractor shall 21 <br />bring it to a uniform grade and cross-section as shown on the Plans or approved by the 22 <br />Engineer. 23 <br /> 24 <br />Preleveling of uneven or broken surfaces over which HMA is to be placed may be 25 <br />accomplished by using an asphalt paver, a motor patrol grader, or by hand raking, as 26 <br />approved by the Engineer. 27 <br /> 28 <br />Compaction of preleveling HMA shall be to the satisfaction of the Engineer and may 29 <br />require the use of small steel wheel rollers, plate compactors, or pneumatic rollers to 30 <br />avoid bridging across preleveled areas by the compaction equipment. Equipment used 31 <br />for the compaction of preleveling HMA shall be approved by the Engineer. 32 <br /> 33 <br />Before construction of HMA on an existing paved surface, the entire surface of the 34 <br />pavement shall be clean. All fatty asphalt patches, grease drippings, and other 35 <br />objectionable matter shall be entirely removed from the existing pavement. All 36 <br />pavements or bituminous surfaces shall be thoroughly cleaned of dust, soil, pavement 37 <br />grindings, and other foreign matter. All holes and small depressions shall be filled with an 38 <br />appropriate class of HMA. The surface of the patched area shall be leveled and 39 <br />compacted thoroughly. Prior to the application of tack coat, or paving, the condition of 40 <br />the surface shall be approved by the Engineer. 41 <br /> 42 <br />A tack coat of asphalt shall be applied to all paved surfaces on which any course of HMA 43 <br />is to be placed or abutted; except that tack coat may be omitted from clean, newly paved 44 <br />surfaces at the discretion of the Engineer. Tack coat shall be uniformly applied to cover 45 <br />the existing pavement with a thin film of residual asphalt free of streaks and bare spots at 46 <br />a rate between 0.02 and 0.10 gallons per square yard of retained asphalt. The rate of 47 <br />application shall be approved by the Engineer. A heavy application of tack coat shall be 48
The URL can be used to link to this page
Your browser does not support the video tag.