Laserfiche WebLink
Drew Martin <br />From: Scott Harris <scott.harris@sdharchitect.com> <br />Sent: Monday, July 31, 2023 9:56 AM <br />To: Drew Martin <br />Subject: [EXTERNAL] RE: City of Everett Permit Services: 10121 Evergreen Way (B2306-064) - First <br />Building Review <br />Attachments: 23-0731 ROTC Southpoint Sushi - Fire Damage Repair -Permit Comments 1.pdf <br />Category 2: Sensitive information <br />CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you <br />recognize the sender and know the content is safe. <br />Drew, <br />Please see our comments below as a response as well as updated sheets A-103 and A-801 for your printing. <br />Scott Harris, NCARB, LEED AP I Principal <br />SDH Architect, LLC <br />2242 NW Reserve Camp Ct <br />Bend, OR 97703 <br />Mobile 206-369-8881 1 scott.harris@sdharchitect.com <br />From: Drew Martin <dmartin@everettwa.gov> <br />Sent: Friday, July 28, 2023 9:42 AM <br />To: Scott Harris <scott.harris@sdharchitect.com> <br />Subject: City of Everett Permit Services: 10121 Evergreen Way (B2306-064) - First Building Review <br />Category 2: Sensitive information <br />Good morning, Scott. <br />This review briefly recaps our telephone conversation for this project. We have completed the first review of the <br />building plans for this project. This email will serve as the review letter. The comments below should be addressed. <br />We had discussed providing new details to tape in. That said, we do have a printer here for full-sized sheets. I think it <br />will be easier to print two new full-size sheets (i.e., Sheets A-103 & A-801). Please let me know if this is acceptable to <br />you. These can be emailed directly to me. Note that if more sheets are impacted, two complete sets of building <br />drawings should be submitted to our office. These sets only need to include the architectural and structures sheets; <br />other disciplines may be omitted. <br />Note for the following comments that the north arrow (i.e., pointing towards the top of the page) in the Site Plan on <br />Sheet A-000 appears most correct. The directional references are based on this rather than the arrow in the framing <br />plans. <br />Comments <br />