Laserfiche WebLink
Architectural: <br />1. The "Building Code Information" section on Sheet A-000 appears to state that either sprinkler and fire alarms <br />systems are existing or will be provided. Based on a review of the building and record documents, it does not <br />appear that either system is existing. If this is an error in the drawings, please confirm that these items should <br />be redlined to state "NO". Otherwise, clarify the intended construction. —SDH Response: This was in error and <br />is not sprinklered or has a fire alarm. <br />2. The existing fire -rating of the west demising wall is not clear from the historical record. It appears that this wall <br />possibly should have been a rated wall to separate the A-2 and B spaces (formerly A-3 and B-3, respectively, per <br />the 1980's UBC codes). It is noted that while the A-2 is in a compartmentalized area enclosed by two-hour "area <br />separation" walls with parapets projecting above the roof, it does not appear to be separated from the B- <br />occupancies within this area, nor does this area appear to be sprinklered. Existing walls being repaired are not <br />required to be upgraded to current code per the IEBC if they were correctly constructed per the code under <br />which they were originally permitted. However, it is not clear that the original construction was code - <br />compliant. We recommend reviewing the existing construction for this wall and the original code requirements, <br />and designing any repairs including upgrades as appropriate. Details for any proposed fire -rated construction <br />should include references to listed tested assemblies per IBC Section 703.3. - SDH Response: See updated <br />sheet A-103 and A-801 with updated details E7/A-801 and C1/A-801. <br />The south "area separation" wall is a two-hour rated wall per the original construction drawings. A detail should <br />be provided including a reference to a listed tested assembly per IBC Section 703.3. Note that this wall appears <br />to be continuous through the roof structure. The continuity detail if provided should be designed accordingly. <br />- SDH Response: See updated sheet A-801 with updated details E7/A-801 and C1/A-801. <br />Please contact me if you have questions. Thank you. <br />Drew Martin, P.E., S.E. <br />® Associate Engineer —Commercial Plans Examiner I Permit Services <br />425.257.8810 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br />EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm — 3 pm; Tu: 1:OOpm-3:OOpm <br />everettwa.gov/permits I Facebook I Twitter <br />Note: Emails and attachments sent to and from the City of Everett are public records and maybe subject to disclosure pursuant to the Public <br />Records Act. <br />Category 2: For official use only/ disclosure permissible by law. <br />Category 2: For official use only / disclosure permissible by law. <br />