Laserfiche WebLink
TFP171 <br />Page 8 of 10 <br />2-7/8" DIA. <br />5/8x1/4" (73,0 mm) 3/4" (19,1 mm) <br />(15,9x6,4 mm) 2-1/4" DIA. 1/4" (6,4 mm) <br />FACE OF (57,2 ram) MOUNTING <br />SPRINKLER PLATE <br />FITTING <br />1/8" <br />(3,2 ram) <br />MOUNTING <br />SURFACE 01 1 <br />CLOSURE SERIES 1-5/16" (33,3 mm) <br />TY-FRB 13/16" (20,6 ram) <br />FIGURE 6 <br />SERIES TY-FRB RECESSED PENDENT <br />WITH TWO-PIECE 314 INCH TOTAL ADJUSTMENT <br />STYLE 10 RECESSED ESCUTCHEON <br />2.8 K-FACTOR, 1/2INCH NPT <br />5/831/4" <br />(15,9x6,4 mm) <br />FACE OF <br />SPRINKLER <br />FITTING <br />MOUNTING <br />SURFACE <br />2-7/8" DIA. <br />(73,0 mm) <br />3/4" (19,1 mm) <br />2-1/4" DIA. <br />1/4" (6,4 mm) <br />(5712 mm) <br />MOUNTING <br />PLATE <br />CLOSURE SERIES <br />TY-FRB <br />1/8" <br />(3,2 ram) <br />1-1/4"(31,8 mm) <br />3/4" (19,1 mm) <br />FIGURE 8 <br />SERIES TY-FRB RECESSED PENDENT <br />WITH TWO-PIECE 314 INCH TOTAL ADJUSTMENT <br />STYLE 10 RECESSED ESCUTCHEON <br />4.2 K-FACTOR, 1/2INCH NPT <br />Initial and frequent visual inspections of <br />random samples are recommended for <br />corrosion -resistant sprinklers to verify <br />the integrity of the corrosion -resistant <br />material of construction. Thereafter, <br />annual inspections per NFPA 25 should <br />suffice. <br />Inspections of corrosion -resistant <br />sprinklers are recommended at close <br />range, instead of from the floor level <br />per NFPA. Inspection at close range <br />can better determine the exact sprin- <br />kler condition and the long-term integ- <br />rity of the corrosion -resistant material, <br />which can be affected by the corrosive <br />conditions present. <br />1/231/8" <br />(12,7x3,2 mm) <br />FACE OF <br />SPRINKLER <br />FITTING <br />u <br />MOUNTING <br />SURFACE <br />2-7/8" DIA. <br />(73,0 mm) <br />1/2" (12,7 mm) <br />2-1/4" DIA. <br />1/4" (6,4 mm) <br />(57,2 mm) <br />71 <br />MOUNTING <br />PLATE <br />CLOSURE SERIES <br />TY-FRB <br />1/8" <br />(3,2 mm) <br />1-5/16"(33,3 mm) <br />1-1/16"(27,0 mm) <br />FIGURE 7 <br />SERIES TY-FRB RECESSED PENDENT <br />WITH TWO-PIECE 112 INCH TOTAL ADJUSTMENT <br />STYLE 20 RECESSED ESCUTCHEON <br />2.8 K-FACTOR, 112 INCH NPT <br />1/231/8" <br />(12,7x3,2 mm) <br />FACE OF <br />SPRINKLER <br />FITTING <br />LL <br />MOUNTING <br />SURFACE <br />2-7/8" DIA. <br />(73,0 mm) <br />1/2" (12,7 mm) <br />2-1/4" DIA. <br />1/4" (6,4 mm) <br />(57,2 mm) <br />71 <br />MOUNTING <br />PLATE <br />CLOSURE SERIES <br />TY-FRB <br />1/8" <br />3,2 mm) <br />1-1/4"(31,8 mm) <br />1" (25,4 mm) <br />FIGURE 9 <br />SERIES TY-FRB RECESSED PENDENT <br />WITH TWO-PIECE 112 INCH TOTAL ADJUSTMENT <br />STYLE 20 RECESSED ESCUTCHEON <br />4.2 K-FACTOR, 112 INCH NPT <br />Responsibility lies with the owner for <br />the inspection, testing, and mainte- <br />nance of their fire protection system <br />and devices in compliance with this <br />document, as well as with the appli- <br />cable standards of the National Fire <br />Protection Association (for example, <br />NFPA 25), in addition to the standards <br />of any other authorities having jurisdic- <br />tion. Contact the installing contractor or <br />sprinkler manufacturer regarding any <br />questions. <br />Automatic sprinkler systems are rec- <br />ommended to be inspected, tested, <br />and maintained by a qualified Inspec- <br />tion Service in accordance with local <br />requirements and/or national codes. <br />Care must be exercised to avoid dam- <br />age to the sprinklers -before, during, <br />and after installation. Sprinklers dam- <br />aged by dropping, striking, wrench <br />twist/slippage, or the like, must be <br />replaced. Also, replace any sprinkler <br />that has a cracked bulb orthat has lost <br />liquid from its bulb. (Ref. Installation <br />Section). <br />Initial and frequent visual inspections of <br />random samples are recommended for <br />corrosion -resistant sprinklers to verify <br />the integrity of the corrosion -resistant <br />material of construction. Thereafter, <br />annual inspections per NFPA 25 should <br />suffice. <br />