Laserfiche WebLink
July 21,2023 <br /> Barry Martin <br /> Heartland Construction <br /> Re: Four Corners Apartments- Final Report <br /> Building A <br /> Dear Barry, <br /> DCG/Watershed (DCGW) performed construction support for the above project during the entire course of <br /> construction. The construction support consisted of reviewing shop drawings and submittals, responding to field <br /> questions both over the phone and through RFI's, reviewing special inspection reports and performing on-site <br /> Structural Observations. <br /> Structural Observations were performed over the course of construction prior to each elevated slab pour and at <br /> the completion of framing. Each observation included a report that should have already been filed with the <br /> jurisdiction. <br /> Based on our on-site observations and support throughout the construction process it is our opinion that the <br /> project was constructed in general compliance with the approved structural drawings. <br /> Sincerely, , C sic, <br /> AS <br /> DCG/Watershed <br /> Ita ne4 <br /> atth hmit er <br /> ate: 7� 1 <br /> Matthew Schmitter, PE, 0`F cT�RAt ENG <br /> Vice President/Principal SS/ONAL EN <br /> Seattle Mount Vernon Whidbey Federal Way Spokane Kirkland <br /> 9706 4th Ave NE,Ste 300 2210 Riverside Dr,Ste 110 1796 E Main St,Ste 105 31620 23rd Ave S,Ste 307 601 W Main Ave,Ste 617 750 611 St S <br /> Seattle,WA 98115 Mount Vernon,WA 98273 Freeland,WA 98249 Federal Way,WA 98003 Spokane,WA 99201 Kirkland,WA 98033 <br /> Tel206.523.0024 Tel360.899.1110 Tel360.331.4131 Tel253.237.7770 Tel509.606.3600 Tel425.822.5242 <br />