Laserfiche WebLink
MEMORANDUM <br /> C. <br /> TO: Mike Vaughn �'�' pF WAgy <br /> Heartland Construction ` ita�i' 'g d <br /> at ch itter <br /> FROM: Matthew Schmitter, PE, SE e: 20 4. .28 <br /> DCG/Watershed P�rG 37334 air -0 00' <br /> fir cT URA L <br /> DATE: December 8, 2023 FSS/oNAL ENG <br /> RE: Epoxy and FRP Installation <br /> Bldg A Four Corners Apartments <br /> DCG/Watershed has reviewed the daily installation notes from Grewhawk Construction for the epoxy <br /> injection and FRP placement as well as the inspection reports from HayreMcElroy&Associates for the <br /> FRP installation and pull testing. Based off these reports, the installation of the epoxy injection and FRP <br /> reinforcing meets the design requirements for the construction joint repair. <br /> It is now acceptable to complete the unit installation, remove the slab shoring and replace the under- <br /> slab insulation. <br /> Seattle Mount Vernon Whidbey Federal Way Spokane Kirkland <br /> 9706 4th Ave NE,Ste 300 2210 Riverside Dr,Ste 110 1796 E Main St,Ste 105 31620 23rd Ave S,Ste 307 601 W Main Ave,Ste 617 750 611 St S <br /> Seattle,WA 98115 Mount Vernon,WA 98273 Freeland,WA 98249 Federal Way,WA 98003 Spokane,WA 99201 Kirkland,WA 98033 <br /> Tel206.523.0024 Tel360.899.1110 Tel360.331.4131 Tel253.237.7770 Tel509.606.3600 Tel425.822.5242 <br />