My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8102 EVERGREEN WAY EVERETT 4 CORNERS - BLDG A 2025-07-28
>
Address Records
>
EVERGREEN WAY
>
8102
>
EVERETT 4 CORNERS - BLDG A
>
8102 EVERGREEN WAY EVERETT 4 CORNERS - BLDG A 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 7:29:28 AM
Creation date
6/17/2025 9:22:40 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8102
Tenant Name
EVERETT 4 CORNERS - BLDG A
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Level 5 previously inspected.See inspection on 3/28 <br /> TPBLDG 09-FIRE <br /> 4/4/2023 4/4/2023 PING/BLOCKIN RAKEEB KHAN NOT READY <br /> G <br /> Notes: <br /> Rescheduled for 4/5/2023.Electrical rough in not approved for L4 <br /> 4/4/2023 4/4/2023 BLDG 12- RAKEEB KHAN PARTIAL L6 walls <br /> INSULATION APPROVAL <br /> Notes: <br /> 3/29/2023 3:06 PM HEARTLAND CONSTRUCTION LLC <br /> L6 <br /> Contact Name:HEARTLAND CONSTRUCTION LLC <br /> Site Address:8102 EVERGREEN WAY BLDG A <br /> Phone:2062804925 <br /> e-Mail:justin.daniels@heartlandwa.com <br /> Level 6 walls <br /> 4/4/2023 4/4/2023 BLDG 12- RAKEEB KHAN PARTIAL L5 <br /> INSULATION APPROVAL <br /> Notes: <br /> Leve 15 <br /> BLDG 09-FIRE PARTIAL <br /> 4/5/2023 4/5/2023 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL eTRAKiT Inspection Request <br /> G <br /> Notes: <br /> 3/29/2023 3:07 PM HEARTLAND CONSTRUCTION LLC <br /> L4 <br /> Contact Name:HEARTLAND CONSTRUCTION LLC <br /> Site Address:8102 EVERGREEN WAY BLDG A <br /> Phone:2062804925 <br /> e-Mail:justin.daniels@heartlandwa.com <br /> Rescheduled from 4/4 to 4/5. <br /> Level 4. Provide rock wool behind wall studs as discussed at 10 foot spacing. <br /> BLDG 09-FIRE PARTIAL <br /> 4/12/2023 4/12/2023 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL Ivl 3 except elevator lobby&idf <br /> G <br /> Notes: <br /> 4/4/2023 12:35 PM HEARTLAND CONSTRUCTION LLC <br /> L3 <br /> Contact Name:HEARTLAND CONSTRUCTION LLC <br /> Site Address:8102 EVERGREEN WAY BLDG A <br /> Phone:2062804925 <br /> e-Mail:justin.daniels@heartlandwa.com <br /> Level 3 except elevator lobby and idf <br /> Level 3 except elevator lobby and idf <br /> I <br /> Printed:Thursday, 12 September,2024 3 of 8 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.