Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 4/12/2023 4/12/2023 BLDG 10-DRYWALL RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> NAILING APPROVAL <br /> Notes: <br /> 4/3/2023 3:17 PM HEARTLAND CONSTRUCTION LLC <br /> L6 <br /> Contact Name:HEARTLAND CONSTRUCTION LLC <br /> Site Address:8102 EVERGREEN WAY BLDG A <br /> Phone:2062804925 <br /> e-Mail:justin.daniels@heartlandwa.com <br /> only units 615 to 620 and 622 <br /> only units 615 to 620 and 622 <br /> 4/12/2023 4/12/2023 BLDG 12- RAKEEB KHAN PARTIAL Ivl 4 <br /> INSULATION APPROVAL <br /> Notes: <br /> Leve 14 <br /> BLDG 09-FIRE PARTIAL <br /> 4/17/2023 4/27/2023 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL level <br /> G <br /> Notes: <br /> level 2 <br /> 4/17/2023 4/27/2023 BLDG 10-DRYWALL RAKEEB KHAN PARTIAL level 6 <br /> NAILING APPROVAL <br /> Notes: <br /> level 6 <br /> 4/17/2023 4/27/2023 BLDG 12- RAKEEB KHAN PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> level 3 <br /> 4/20/2023 4/20/2023 BLDG 10-DRYWALL KURT KECK PARTIAL L5 units drywall nailing <br /> NAILING APPROVAL <br /> Notes: <br /> 4/11/2023 1:29 PM HEARTLAND CONSTRUCTION LLC <br /> L2 <br /> Contact Name:HEARTLAND CONSTRUCTION LLC <br /> Site Address:8102 EVERGREEN WAY BLDG A <br /> Phone:2062804925 <br /> e-Mail:justin.daniels@heartlandwa.com <br /> Change inspection to drywall nailing L5 <br /> kmk changed Inspection Type from BLDG 09-FIRE STOPPING/BLOCKING to BLDG 10-DRYWALL NAILING <br /> 4/20/2023 4/20/2023 BLDG 12- KURT KECK PARTIAL L 2 thermal <br /> INSULATION APPROVAL <br /> Notes: <br /> I <br /> Printed:Thursday, 12 September,2024 4 of 8 rk <br /> SUPERION <br />