My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 COLBY AVE 2025-07-18
>
Address Records
>
COLBY AVE
>
4030
>
4030 COLBY AVE 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 3:59:43 PM
Creation date
6/18/2025 9:22:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Traffic Engineering Reviewer. All questions shall be routed through this project's <br />Public Works Reviewer Thad Newport with City of Everett Permit Services (TNewportC@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />corroborate the information in the Valmont shop drawings on <br />this sheet. <br />5. There is a callout on the new pole referencing Valmont <br />drawings from 6/3/2019. Please update this date with the most <br />recent date for the complete set of Valmont shop drawings and <br />attach the complete set of those drawings. <br />6. This sheet shows a truss style arm, which is the COE preferred <br />arm for this location, but there is no Valmont shop drawing <br />showing the details of the luminaire arm. Please submit <br />complete Valmont shop drawings showing the pole, luminaire <br />arm, and all relevant pole, arm, and pole associated equipment <br />details. <br />7. There is a callout to a tapered skirt by "Western UT". Please <br />clarify whether "Western UT" should be there as that was the <br />non-COE approved pole manufacturer from previous plan <br />submittals. <br />8. There is a rectangle below the luminaire arm shown on this <br />sheet that is possibly one of the required signs from sheet RF3. <br />Please call out what this rectangle is and its purpose. <br />6 <br />RF-2 <br />1. Please make the information shown on the RF series sheets <br />corroborate with the pole shop drawings, and the G sheets. <br />Comments 2-4 explicitly deal with making sure no conflicting <br />information is being shown in different sheet series. <br />2. There is cabinet enclosure information (festoon box) shown <br />on these sheets that are not shown in the Valmont pole and <br />luminaire arm shop drawings. Please submit complete Valmont <br />pole shop drawing that show the enclosure information shown <br />on these sheets. <br />3. Please either call out on this sheet in detail 2 or note the <br />location of the COE foundation finishing details located on detail <br />5 of sheet G1 including but not limited to the %" chamber, no <br />chamber in paved area callout, the 2" nominal grout pad callout, <br />and the 1" min — max in unpaved area... callout. <br />Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.