Laserfiche WebLink
The comments below were generated from this project's City of Everett Traffic Engineering Reviewer. All questions shall be routed through this project's <br />Public Works Reviewer Thad Newport with City of Everett Permit Services (TNewportC@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />11. Please change the wording of C note 9 to say "Disconnect <br />wire run going south and tape off to make this the new end of <br />the line pole run." <br />10 <br />I12 <br />1. Please make the second row of wire note 2 call for 2-2" <br />conduits for spare future use. <br />11 <br />T1 <br />1. Please evaluate whether a Type 8 box is needed to <br />accommodate the additional 2" conduit that will be running <br />from here to the illumination Type 8 box to the south. <br />Page 10 of 10 <br />