Laserfiche WebLink
The comments below were generated from this project's City of Everett Traffic Engineering Reviewer. All questions shall be routed through this project's <br />Public Works Reviewer Thad Newport with City of Everett Permit Services (TNewport(cDeverettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />junction boxes, and the traffic signal loops to ensure there are <br />8.22x12x12 junction box that conflicted with IL1 <br />no conflicts in this work area. <br />and TS1 has been removed and replaced with a <br />22x12x12 junction box that matches the IL1 and <br />8. Please remove the information about the proposed 22x12x12 <br />TS2 SoW. <br />junction COE junction boxes and show the information that is on <br />the I1_1 and TS1 on this sheet to properly show the tie ins to the <br />COE illumination system. <br />9. Please show the existing pole being removed with its <br />9. Existing pole is called with all additional <br />foundation being removed entirely and conduits cut off 24" <br />stipulations included. <br />below grade. <br />10. Please show the new pole being installed in line with the old <br />10. New pole is now location 10' south from its <br />pole but approximately 5-10' to the north to move the new small <br />original position. <br />cell pole further away from our existing COE signal pole and <br />equipment. <br />3 <br />A-2 <br />1. Please make the information shown on the A series sheets <br />1. A -sheets have been revised to corroborate <br />corroborate with the pole shop drawings, and the work being <br />with pole shop drawings, IL, & TS sheets. <br />done on the IL and TS sheets. Comments 2-7 explicitly deal with <br />Changes have been clouded & delta'd. <br />making sure no conflicting information is being shown in <br />different sheet series. <br />2. callout has been removed per request <br />2. There is no existing power vault at the bottom of the north leg <br />crossing curb ramp. Please remove the callout saying there is an <br />existing power vault at the bottom of the north leg crossing curb <br />ramp. Vaults and/or junction boxes are not allowed in any part <br />of a curb ramp. Please relocate this vault to be away from the <br />north leg crossing curb ramp and also away from the traffic <br />signal loops which are shown on the TS sheets. <br />3. Vault design has been revised per IL&TS <br />sheets <br />3. There appears to be 3 new vaults or junction boxes shown on <br />this sheet, 2 of which have no callouts. Please explain the <br />purpose of these vaults or junction boxes on this sheet. <br />4. Vault design has been revised per IL&TS <br />4. There appears to be 3 new vaults or junction boxes shown on <br />sheets <br />this sheet, 2 of which have no callouts. Please show these vaults <br />or junctions boxes on sheets I1_1 and TS1 to ensure there are no <br />conflicts in this work area. <br />5. Requested notes have been added <br />Page 3 of 10 <br />