Laserfiche WebLink
The comments below were generated from this project's City of Everett Traffic Engineering Reviewer. All questions shall be routed through this project's <br />Public Works Reviewer Thad Newport with City of Everett Permit Services (TNewport(aDeverettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />pole shop drawing at 16' but no cabinet enclosure information. <br />Please submit complete Valmont pole shop drawing that shows <br />the enclosure information shown on these sheets and <br />corroborate the information in the Valmont shop drawings on <br />5. Drawing date had been updated <br />this sheet. <br />5. There is a callout on the new pole referencing Valmont <br />drawings from 6/3/2019. Please update this date with the most <br />6. Valmont has provided drawings with added <br />recent date for the complete set of Valmont shop drawings and <br />detail for the luminaire arms. <br />attach the complete set of those drawings. <br />6. This sheet shows a truss style arm, which is the COE preferred <br />arm for this location, but there is no Valmont shop drawing <br />showing the details of the luminaire arm. Please submit <br />complete Valmont shop drawings showing the pole, luminaire <br />7. Callout has been revised to remove Western <br />arm, and all relevant pole, arm, and pole associated equipment <br />UT <br />details. <br />7. There is a callout to a tapered skirt by "Western UT". Please <br />8. rectangle has been removed <br />clarify whether "Western UT" should be there as that was the <br />non-COE approved pole manufacturer from previous plan <br />submittals. <br />8. There is a rectangle below the luminaire arm shown on this <br />sheet that is possibly one of the required signs from sheet RF3. <br />Please call out what this rectangle is and its purpose. <br />6 <br />RF-2 <br />1. Please make the information shown on the RF series sheets <br />1. RF-sheets have been revised to corroborate <br />corroborate with the pole shop drawings, and the G sheets. <br />with pole shop drawings G-sheets. Changes have <br />Comments 2-4 explicitly deal with making sure no conflicting <br />been clouded & delta'd. <br />information is being shown in different sheet series. <br />2. The cabinet enclosure is not being provided <br />2. There is cabinet enclosure information (festoon box) shown <br />by Valmont thus it would not be shown in their <br />on these sheets that are not shown in the Valmont pole and <br />submittal package. The loading is accounted for <br />in the calculations and loading information was <br />luminaire arm shop drawings. Please submit complete Valmont <br />added to the pole drawing package. <br />pole shop drawing that show the enclosure information shown <br />on these sheets. <br />3. A reference to sheet G-1 Detail 5 has been <br />added to this detail <br />Page 6 of 10 <br />