Laserfiche WebLink
The comments below were generated from this project's City of Everett Traffic Engineering Reviewer. All questions shall be routed through this project's <br />Public Works Reviewer Thad Newport with City of Everett Permit Services (TNewport(cDeverettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />9 <br />I11 <br />1. Please make the information shown on the A series sheets <br />Our team reviewed to ensure no conflicting <br />corroborate with the pole shop drawings, and the work being <br />information on design sheets. <br />done on the IL and TS sheets. Comments 2-3 explicitly deal with <br />making sure no conflicting information is being shown in <br />different sheet series. <br />2. There appears to be 3 new vaults or junction boxes shown on <br />We reviewed and determined no conflicts. <br />sheets Al and A2, 2 of which have no callouts. Please show these <br />vaults or junctions boxes on sheets I11 and TS1 to ensure there <br />are no conflicts in this work area and verify whether additional <br />frontage improvements are required. <br />We elected not to do this to keep clarity for the <br />contractor. Instead, our team reviewed potential <br />3. Please show the sidewalk hatch patterns, landscaping and <br />conflicts and did not find any. <br />utility runs show on sheets Al and A2 to make sure there are no <br />conflicts in this work area. <br />Revised. <br />4. Please add the 200' to stop bar call out info to this sheet to <br />inform the distance for the sidewalk restoration length. <br />5. Please add the sentence "PUD Power Source." to the <br />Revised. <br />beginning of C note 4. <br />6. Please add the following sentence to the end of C note 7:" <br />Revised. Please note that CN 7 applies to <br />Install Type 2 Junction box with load bearing ring and slip <br />multiple sites. As such, we made a CN that <br />resistant lid and splice new illumination circuit to existing pole <br />addresses these comments but allows CN 7 to <br />with new breakaway fuser holders. At existing pole locate pole <br />remain for the rest of the poles not impacted. <br />base conduit stub out and extend conduit into 2 type junction <br />box." Please update the plan sheet and wiring schedule to show <br />Revised. <br />a wire run between the existing pole and the new junction box. <br />7. Please add a C note calling for the removal and disposal of the <br />existing street light pole and foundation. Note that foundation is <br />to be removed entirely and conduits cut off 24" below grade. <br />Revised. <br />Note that the luminaire is to be relocated to the new pole. <br />8. Please show the new pole being installed in line with the old <br />pole but approximately 5-10' to the north to clear the existing <br />Revised. <br />foundation and to move the new small cell pole further away <br />from our existing COE signal pole and equipment. <br />Page 9 of 10 <br />