My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 COLBY AVE 2025-07-18
>
Address Records
>
COLBY AVE
>
4030
>
4030 COLBY AVE 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 3:59:43 PM
Creation date
6/18/2025 9:22:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Traffic Engineering Reviewer. All questions shall be routed through this project's <br />Public Works Reviewer Thad Newport with City of Everett Permit Services (TNewport(cDeverettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />9 <br />I11 <br />1. Please make the information shown on the A series sheets <br />Our team reviewed to ensure no conflicting <br />corroborate with the pole shop drawings, and the work being <br />information on design sheets. <br />done on the IL and TS sheets. Comments 2-3 explicitly deal with <br />making sure no conflicting information is being shown in <br />different sheet series. <br />2. There appears to be 3 new vaults or junction boxes shown on <br />We reviewed and determined no conflicts. <br />sheets Al and A2, 2 of which have no callouts. Please show these <br />vaults or junctions boxes on sheets I11 and TS1 to ensure there <br />are no conflicts in this work area and verify whether additional <br />frontage improvements are required. <br />We elected not to do this to keep clarity for the <br />contractor. Instead, our team reviewed potential <br />3. Please show the sidewalk hatch patterns, landscaping and <br />conflicts and did not find any. <br />utility runs show on sheets Al and A2 to make sure there are no <br />conflicts in this work area. <br />Revised. <br />4. Please add the 200' to stop bar call out info to this sheet to <br />inform the distance for the sidewalk restoration length. <br />5. Please add the sentence "PUD Power Source." to the <br />Revised. <br />beginning of C note 4. <br />6. Please add the following sentence to the end of C note 7:" <br />Revised. Please note that CN 7 applies to <br />Install Type 2 Junction box with load bearing ring and slip <br />multiple sites. As such, we made a CN that <br />resistant lid and splice new illumination circuit to existing pole <br />addresses these comments but allows CN 7 to <br />with new breakaway fuser holders. At existing pole locate pole <br />remain for the rest of the poles not impacted. <br />base conduit stub out and extend conduit into 2 type junction <br />box." Please update the plan sheet and wiring schedule to show <br />Revised. <br />a wire run between the existing pole and the new junction box. <br />7. Please add a C note calling for the removal and disposal of the <br />existing street light pole and foundation. Note that foundation is <br />to be removed entirely and conduits cut off 24" below grade. <br />Revised. <br />Note that the luminaire is to be relocated to the new pole. <br />8. Please show the new pole being installed in line with the old <br />pole but approximately 5-10' to the north to clear the existing <br />Revised. <br />foundation and to move the new small cell pole further away <br />from our existing COE signal pole and equipment. <br />Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.