My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 COLBY AVE 2025-07-18
>
Address Records
>
COLBY AVE
>
4030
>
4030 COLBY AVE 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 3:59:43 PM
Creation date
6/18/2025 9:22:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br />WASHINGTON <br />PUBLIC WORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2na Floor <br />Everett, WA 98201 <br />425-257-8810 <br />Date Applied: 8/20/2019 <br />Public Works Permit M PW1908-039 <br />Associated Bldg Permit #: <br />Planning Reference #: SPU19-003 <br />Public Works Fee: $1,759.15 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />CITY OF EVERETT <br />RODRIGUEZ JAY <br />3200 CEDAR ST <br />EVERETT, WA, 98201 <br />PHONE: <br />PHONE: 8185159743 <br />TAX PARCEL ID M 00439168701902 <br />SITE ADDRESS: 2912 BROADWAY <br />DESCRIPTION: PROPOSED SMALL CELLWIRELESS FACILITY <br />NODE ATTACHMENT TO NEW UTILITY LIGHT POLE INCL NEW FOUNDATION TO REPLACE EXISTING UTILITY LIGHT POLE/ FIBER AND <br />POWER PERMITTING PROVIDED BY OTHERS. <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications <br />for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site at <br />all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br />required inspections. A handout is provided at permit issuance with instructions on how to request an inspection online. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector or the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on - <br />site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the <br />improvements located therein. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained <br />from the City's Traffic Engineering Division. This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be <br />submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />12. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br />selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br />completed. <br />13. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of <br />the right-of-way for municipal purposes. <br />14. Potholing required for all crossings over/under City of Everett water mains. <br />15. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br />16. Noise from temporary construction sites is not allowed 10:OOPM—7:OOAM weekdays, 6:OOPM—8:OOAM weekends unless a variance has <br />been issued. Construction projects wishing a variance from the noise ordinance must submit an application at least 30 days prior to <br />commencing work. Please visit the following website for more information https://everettwa.gov/1545/Noise-Administration <br />j <br />CONTINUED ON NEXT PAGE.... <br />
The URL can be used to link to this page
Your browser does not support the video tag.