My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 COLBY AVE 2025-07-18
>
Address Records
>
COLBY AVE
>
4030
>
4030 COLBY AVE 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 3:59:43 PM
Creation date
6/18/2025 9:22:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />Date Applied: 8/20/2019 <br />EVERETT <br />WASHINGTON <br />City of Everett Permit Services <br />3200 Cedar Street, 2"a Floor <br />Everett, WA 98201 <br />425-257-8810 <br />....CONTINUED FROM PREVIOUS PAGE <br />Public Works Permit Fee Breakdown <br />Erosion Control....................................................... <br />$50.00 <br />Paving(13625F)...................................................... <br />$45.00 <br />Cut/Bore Alley/Pavement (Parallel) (209 LF) ....... <br />$209.00 <br />PW Plan Review ...................................................... <br />$20.00 <br />PW Site Inspection ................................................. <br />$20.00 <br />Stormwater System Development Fee ................ <br />$364.74 <br />Public Works Permit #: PW1908-039 <br />Associated Bldg Permit #: <br />Planning Reference #: SPU19-003 <br />Public Works Fee: $1,759.15 <br />Permit Notes: <br />We've had enough projects that hope and plan and try to not damage our loops and then end up damaging them due to changing field <br />conditions that we now direct applicants to plan to replace them and then recoup the savings from not damaging them, rather than to <br />have to deal with Construction pricing change orders in the field. If the loops are truly not damaged in the field when the work <br />happens, our field inspectors and signal maintenance crew will happily prefer to leave the existing loops in place. The special <br />provisions are provided as a part of this 'prepare for the worst and hope for the best' practice. <br />City of Everett Official Use Only <br />Approved for Construction, Public Works Dept. Date <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant <br />hereby agrees to hold and save harmless the City of Everett from any <br />and all claims for damages, costs, expenses, or causes of action that <br />may arise because of installation and maintenance of the <br />improvement or other right-of-way use here to applied for and further <br />agrees to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAYBE CANCELLED BY THE <br />CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. EACH INSPECTION MENDS THE UPI RATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />,V APPI ICANT/IOR SITF rnPy TRFASIIRFR ADDRFSS Ell <br />
The URL can be used to link to this page
Your browser does not support the video tag.