Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through the following reviewers: General <br />Civil: Sabrina Good, SGood(cDeverettwa.gov; Signal, pole, & illumination: Euneka Richards, ERichards(@everettwa.gov; SLA: Darcie Byrd, DByrd(cDeverettwa.gov. <br />When coordinating by email, send to all reviewers listed above regardless of subject matter. <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />5 <br />Signal & <br />IL1 <br />Please add a wire note showing that the extra (2) 3" conduits run <br />Illumination <br />to the junction box referenced in comment 4 above. <br />(1of5) <br />Plans <br />& 112 <br />(2of5) <br />6 <br />Signal & <br />I12 <br />Please add the word "detectable" between "all empty conduits <br />Ill umination <br />shall have" and "pullcords installed by the Contractor" to the wire <br />Plans <br />(2 of 5) <br />schedule notes below the wire schedule. <br />Final note shall read as follows: <br />"ALL NEW ILLUMINATION CONDUIT SHALL HAVE 146 <br />GROUND WIRE. ALL EMPTY CONDUITS SHALL HAVE <br />DETECTABLE PULL CORDS INSTALLED BY THE <br />CONTRACTOR. BREAKAWAY FUSE HOLDERS MUST BE <br />USED FOR LIGHTING CIRCUIT AT POLE L1. NEW 5G <br />CIRCUIT SHALL HAVE BREAKAWAY FUSE HOLDERS AT <br />POLE L1. ALL #6 GAUGE AND SMALLER WIRE SHALL HAVE <br />WHITE NEUTRAL." <br />7 <br />Signal & <br />I12 <br />Please update language to say "Spare conduit with detectable <br />Ill umination <br />pull cord for future use" to spare conduit notes in wire schedule <br />(2 of 5) <br />(3ra line of No. 1). <br />Plans <br />8 <br />Signal & <br />I12 <br />Please update wire schedule heading to say (NW corner4l" St — <br />Illumination <br />(2 of 5) <br />Colby Ave) instead of Hewitt Ave and Maple St as currently <br />Plans <br />shown. <br />Page 3 of 6 <br />