Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through the following reviewers: General <br />Civil: Sabrina Good, SGood(cDeverettwa.gov; Signal, pole, & illumination: Euneka Richards, ERichards(@everettwa.gov; SLA: Darcie Byrd, DByrd(cDeverettwa.gov. <br />When coordinating by email, send to all reviewers listed above regardless of subject matter. <br />q <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />1 <br />General <br />— <br />The latest submittal turned in to the City was incomplete. It only <br />Submittal <br />included the new illumination plans and did not include any of the <br />previous civil plans or pole/antenna/equipment plans that were <br />referenced. The SLA was also mentioned but was not submitted <br />to start back and forth revisions. <br />The next submittal will need to be a complete package that can <br />be issued for construction to include all plans including civils <br />(Mastec/AT&T plans), illumination plans, pole manufacturer's <br />specs, antenna & equipment, marked up SLA, and any other <br />document that was prepared for construction. This next <br />resubmittal also needs all plans to be coordinated with each other <br />(backgrounds and designs should match and not be <br />contradicting. All plan sets and documents submitted need to be <br />revised to correctly call out the permit address of 4030 Colby <br />Ave. There are currently several inconsistencies throughout the <br />various documents. Revisions are required to get the plans <br />synced with each other. <br />2 <br />Signal & <br />IL1 <br />Add PUD language to Construction Note 4: PUD power source. <br />Illumination <br />Install conduit and conductors to Snohomish PUD Pedestal per <br />Plans <br />(1 of 5) <br />serving utility requirements with large diameter sweeps. <br />Coordinate power connection with the utility company through the <br />Engineer a minimum of 5 business days prior. <br />3 <br />Signal & <br />IL1 <br />Construction Note 8 references "Dwg Nos. A-1 to A-4" from a <br />Illumination <br />previous review package. Please attach those sheets to this plan <br />Plans <br />(1 of 5) <br />set for re -review and make sure the comments in previous review <br />periods have been addressed. See comment 17 below regarding <br />relevant previous review period comments. <br />4 <br />Signal & <br />IL1 <br />Please add a Construction Note for new junction box being <br />Ill umination <br />installed adjacent to the new pole in Construction Note 8. Please <br />Plans <br />(1 of 5) <br />make sure the junction box is sized to connect to the extra (2) 3" <br />conduits from new service cabinet foundation in Construction <br />Note 10. <br />Page 2 of 6 <br />