My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 COLBY AVE 2025-07-18
>
Address Records
>
COLBY AVE
>
4030
>
4030 COLBY AVE 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 3:59:43 PM
Creation date
6/18/2025 9:22:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through the following reviewers: General <br />Civil: Sabrina Good, SGood(cDeverettwa.gov; Signal, pole, & illumination: Euneka Richards, ERichards(@everettwa.gov; SLA: Darcie Byrd, DByrd(cDeverettwa.gov. <br />When coordinating by email, send to all reviewers listed above regardless of subject matter. <br />q <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />1 <br />General <br />— <br />The latest submittal turned in to the City was incomplete. It only <br />Submittal <br />included the new illumination plans and did not include any of the <br />previous civil plans or pole/antenna/equipment plans that were <br />referenced. The SLA was also mentioned but was not submitted <br />to start back and forth revisions. <br />The next submittal will need to be a complete package that can <br />be issued for construction to include all plans including civils <br />(Mastec/AT&T plans), illumination plans, pole manufacturer's <br />specs, antenna & equipment, marked up SLA, and any other <br />document that was prepared for construction. This next <br />resubmittal also needs all plans to be coordinated with each other <br />(backgrounds and designs should match and not be <br />contradicting. All plan sets and documents submitted need to be <br />revised to correctly call out the permit address of 4030 Colby <br />Ave. There are currently several inconsistencies throughout the <br />various documents. Revisions are required to get the plans <br />synced with each other. <br />2 <br />Signal & <br />IL1 <br />Add PUD language to Construction Note 4: PUD power source. <br />Illumination <br />Install conduit and conductors to Snohomish PUD Pedestal per <br />Plans <br />(1 of 5) <br />serving utility requirements with large diameter sweeps. <br />Coordinate power connection with the utility company through the <br />Engineer a minimum of 5 business days prior. <br />3 <br />Signal & <br />IL1 <br />Construction Note 8 references "Dwg Nos. A-1 to A-4" from a <br />Illumination <br />previous review package. Please attach those sheets to this plan <br />Plans <br />(1 of 5) <br />set for re -review and make sure the comments in previous review <br />periods have been addressed. See comment 17 below regarding <br />relevant previous review period comments. <br />4 <br />Signal & <br />IL1 <br />Please add a Construction Note for new junction box being <br />Ill umination <br />installed adjacent to the new pole in Construction Note 8. Please <br />Plans <br />(1 of 5) <br />make sure the junction box is sized to connect to the extra (2) 3" <br />conduits from new service cabinet foundation in Construction <br />Note 10. <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.