My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 COLBY AVE 2025-07-18
>
Address Records
>
COLBY AVE
>
4030
>
4030 COLBY AVE 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 3:59:43 PM
Creation date
6/18/2025 9:22:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through the following reviewers: General <br />Civil: Sabrina Good, SGood(cDeverettwa.gov; Signal, pole, & illumination: Euneka Richards, ERichards(@everettwa.gov; SLA: Darcie Byrd, DByrd(cDeverettwa.gov. <br />When coordinating by email, send to all reviewers listed above regardless of subject matter. <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />14 <br />General <br />— <br />The comments below (#'s 15-21) pertain to plan sheets that were <br />Submittal <br />previously submitted but never fully approved <br />(AT&T/Mastec/LETS plans). While the current Perteet plans <br />reconcile several of the previous Public Works & Traffic <br />Engineering comments, they not yet resolve the below previous <br />comments. Please either address the below issues in the new <br />Perteet plan sheets or resubmit the below called out sheets with <br />the required changes made for approval or further comment. <br />15 <br />Previous <br />A-3 & A-4 <br />Please call out galvanized steel instead of RAL 9006 White <br />Review <br />Aluminum for the type of pole finish. <br />Traffic <br />Engineering <br />Comment <br />16 <br />Previous <br />RF-2 / E-1 <br />Please call out on detail 1 on sheet RF-2 which conduits will <br />Review <br />house the RRH Power, the RRH Fiber, Fiber, and the Coax cable <br />Traffic <br />shown in detail 1 of E-1as they transition from the conduit into the <br />pole. Add additional conduits if necessary, to detail 1 on sheet <br />Engineering <br />RF-2. <br />Comment <br />17 <br />Previous <br />S-1, F-1 <br />Western UT is not a City approved pole manufacturer. Please <br />Review <br />resubmit shop drawings from either Valmont or a City approved <br />Traffic <br />pole manufacturer. <br />Engineering <br />Comment <br />18 <br />Previous <br />A-1, A-2, <br />Upgrade background of civil plans to be consistent throughout all <br />Review <br />A-2.1, & <br />plan sets. Sheets 1-6 of the Verizon/MGC Plans correctly show <br />Public <br />1-6 <br />surveyed utilities and existing features such as sidewalk hatch <br />patterns, landscaping, curb ramps, etc. However, sheets A-1, A- <br />Works <br />2, A-2.1 of the AT&T/Mastec/LETS plans do not show any <br />Comment <br />surveyed utilities, curb ramps, sidewalk or intersection features. <br />(Civil Plans) <br />The City cannot perform a review of new infrastructure to be <br />installed if the existing features are not shown in the <br />background/basemap of the plans as one of the main <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.