Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through the following reviewers: General <br />Civil: Sabrina Good, SGood(cDeverettwa.gov; Signal, pole, & illumination: Euneka Richards, ERichards(@everettwa.gov; SLA: Darcie Byrd, DByrd(cDeverettwa.gov. <br />When coordinating by email, send to all reviewers listed above regardless of subject matter. <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />components we are reviewing for is conflicts with existing utilities. <br />Please make updates to all plan sets for consistency in <br />background detail and submit all plan sets as one construction <br />package for re -review and permit issuance. <br />19 <br />Previous <br />All restoration needs to be called out per City of Everett Standard <br />Review <br />Drawing name and number. On the various plan sets, partial COE <br />Public <br />Standard Dwg details are included. Other plan sets (like the <br />Works <br />illumination plans) include details for restoration but are not <br />consistent with the other plan sets. If your details (such as in the <br />Comment <br />Perteet drawings) provide site -specific information beyond what <br />(Civil Plans) <br />COE standard drawings show, they are OK to be used, but <br />should be used consistently and should be equivalent or greater <br />than what is required in COE standard drawings. For any COE <br />Standard Drawing that is included in the plan sets, please make <br />sure they are updated to the current standard drawings. View the <br />current standard drawings at https://everettwa.00v/1531/Design- <br />Construction-Standards. Do not include contradicting details <br />among the different plan sets. <br />20 <br />Previous <br />IL1, T1, A- <br />Restoration of sidewalk needs to be full panel replacement, <br />Review <br />1, A-2, A- <br />consistent with Standard Drawing #312. Please update the plans <br />Public <br />2.1 <br />(civil and illumination plans) to correctly show and call out in <br />Works <br />construction notes the restoration to be full panel replacement. <br />Comment <br />(Civil Plans) <br />21 <br />Previous <br />AT&T/ <br />Update address on plans to be consistent with permit application. <br />Review <br />Mastec/ <br />Should be 4030 Colby Ave, (not 4020 Colby Ave or 4031 Colby <br />Public <br />LETS plans <br />Ave as currently shown throughout the various plan sets). <br />Works <br />sheet T-1 <br />Comment <br />& Verizon/ <br />(Civil Plans) <br />MGC Plans <br />Sheet 1 of <br />6 <br />Page 6 of 6 <br />