My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 COLBY AVE 2025-07-18
>
Address Records
>
COLBY AVE
>
4030
>
4030 COLBY AVE 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 3:59:43 PM
Creation date
6/18/2025 9:22:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through the following reviewers: General <br />Civil: Sabrina Good, SGoodPeverettwa.gov & Thad Newport TNewportPeverettwa.gov; Signal, pole, & illumination: Euneka Richards, <br />ERichards everettwa. ov; SLA: Darcie Byrd, DByrdPeverettwa.gov. When coordinating by email, please send to all reviewers listed above regardless of <br />subject matter. <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />4 <br />Previous <br />A-3 & A-4 <br />Previous Comment #15: <br />Previous Response: <br />Review <br />Please call out galvanized steel instead of RAL 9006 White <br />Revised. <br />Traffic <br />Aluminum for the type of pole finish. <br />Engineering <br />New Comment: <br />Comment <br />New Response: <br />There is a reference in the installer note to hot dipped galvanized <br />finish but does not specify galvanized steel. Please update <br />accordingly. Also, the Note on this page says to see the attached <br />pole and foundation design pages for more detail but does not <br />reference the page numbers for that sheet. Please update and <br />include those sheets in the plan set. <br />5 <br />Previous <br />RF-2 / E-1 <br />Previous Comment #16: <br />Previous Response: <br />Review <br />Please call out on detail 1 on sheet RF-2 which conduits will <br />Revised. <br />Traffic <br />house the RRH Power, the RRH Fiber, Fiber, and the Coax cable <br />Engineering <br />shown in detail 1 of E-1as they transition from the conduit into the <br />Comment <br />pole. Add additional conduits if necessary, to detail 1 on sheet <br />New Response: <br />R F-2. <br />New Comment: <br />Your response says this has been revised but detail 1 on sheet <br />RF-2 does not have the callouts as required in the previous <br />comment #16. Please update the plans to call out the conduits <br />specifically as noted. If further explanation is needed, or guidance <br />as to where/how the plans have been revised, please explain so <br />in your new response. <br />Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.