Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through the following reviewers: General <br />Civil: Sabrina Good, SGoodPeverettwa.gov & Thad Newport TNewportPeverettwa.gov; Signal, pole, & illumination: Euneka Richards, <br />ERichards everettwa. ov; SLA: Darcie Byrd, DByrdPeverettwa.gov. When coordinating by email, please send to all reviewers listed above regardless of <br />subject matter. <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />4 <br />Previous <br />A-3 & A-4 <br />Previous Comment #15: <br />Previous Response: <br />Review <br />Please call out galvanized steel instead of RAL 9006 White <br />Revised. <br />Traffic <br />Aluminum for the type of pole finish. <br />Engineering <br />New Comment: <br />Comment <br />New Response: <br />There is a reference in the installer note to hot dipped galvanized <br />finish but does not specify galvanized steel. Please update <br />accordingly. Also, the Note on this page says to see the attached <br />pole and foundation design pages for more detail but does not <br />reference the page numbers for that sheet. Please update and <br />include those sheets in the plan set. <br />5 <br />Previous <br />RF-2 / E-1 <br />Previous Comment #16: <br />Previous Response: <br />Review <br />Please call out on detail 1 on sheet RF-2 which conduits will <br />Revised. <br />Traffic <br />house the RRH Power, the RRH Fiber, Fiber, and the Coax cable <br />Engineering <br />shown in detail 1 of E-1as they transition from the conduit into the <br />Comment <br />pole. Add additional conduits if necessary, to detail 1 on sheet <br />New Response: <br />R F-2. <br />New Comment: <br />Your response says this has been revised but detail 1 on sheet <br />RF-2 does not have the callouts as required in the previous <br />comment #16. Please update the plans to call out the conduits <br />specifically as noted. If further explanation is needed, or guidance <br />as to where/how the plans have been revised, please explain so <br />in your new response. <br />Page 4 of 8 <br />