My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Justin Kerr <jkerr@seahurst.com> <br />Cc: Terri Jorgenson <TJorgenson@eve rettwa.gov>; Andy Farrington <Andy. Farrington @ She Iterholdings.com> <br />Subject: RE: Clarification for Riverfront Temp Power Permit E2010-120 <br />[EXTERNAL EMAIL] <br />Thanks, Justin. We are having our consent decree peer reviewers at Floyd I Snider review your proposal to ensure <br />compliance. The CD -related concern with trenching in those conduits would be with the trench backfill and contingency <br />for encountering refuse, not just the Class 1 Div 2 requirements. They may reach out to you directly or I may ask for <br />additional review material if needed. <br />Thanks, <br />— Sabrina Fandler, P.E. <br />Permit Services Manager I Permit Services <br />425.257.8810, Option 6 1 3200 Cedar Street, 2i' Floor, Everett, WA 98201 <br />EVERETT Phone Hours: M/W/Th: 8 a.m. —12 p.m & 1 p.m. — 3 p.m. <br />everettwa.gov/permits I Facebook I Twitter <br />COVID-19 Update: Please reference our website & online resources for updates to our service during the <br />COVID-19 pandemic. Due to limited staff and increased volumes, response times have increased and may take <br />as long as 3 — 5 business days. Your patience is appreciated as we respond in the order received. Thank you <br />and stay well. <br />Note: Emails and attachments sent to and from the City of Everett are public records and maybe subject to disclosure pursuant to the Public <br />Records Act. <br />From: Justin Kerr <ikerr@seahurst.com> <br />Sent: Wednesday, October 21, 2020 11:29 AM <br />To: Sabrina Fandler<SFandler@everettwa.gov> <br />Cc: Terri Jorgenson <TJorgenson@everettwa.gov>; Andy Farrington <Andy.Farrington@Shelterholdings.com> <br />Subject: RE: Clarification for Riverfront Temp Power Permit E2010-120 <br />Sabrina, <br />All conduits will be underground, if in PVC they will covered in CDF/Concrete to maintain Class 1 Div 2 requirements, <br />smaller and shorter conduits may be in LFMC underground as well. <br />The 12470 transformer will be pad mounted on a custom pad to get above 18" classification zone. There will NOT be a <br />vault. <br />Justin Kerr <br />425.508.4937-c 1425.258.5115-d <br />Ikerr@seahurst.com <br />From: Sabrina Fandler <SFandler@everettwa.gov> <br />Sent: Wednesday, October 21, 2020 11:24 AM <br />To: Justin Kerr <Ikerr@seahurst.com> <br />Cc: Terri Jorgenson <TJorgenson@everettwa.gov> <br />Subject: Clarification for Riverfront Temp Power Permit E2010-120 <br />Hi Jake, <br />
The URL can be used to link to this page
Your browser does not support the video tag.