Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Table 4. Proposed Reclamation Seed Mix <br />Species Common <br />Species Latin <br />Percent <br />Number of <br />Number of <br />PLS <br />Name <br />Name <br />of Seed <br />Seeds per <br />Seeds per <br />Pounds <br />Mix <br />Pound a <br />Sq Ft b <br />per Acre <br />Blue Wildrye <br />Elymus glaucus <br />90 <br />134,500 <br />72 <br />23.3 <br />Re -Green (Sterile <br />Triticum <br />10 <br />11,000 <br />8 <br />31.7 <br />Wheatgrass Hybrid) <br />Aestivum X <br />Elytrigiael <br />Ongota <br />a Number of seeds per pound information taken from Granite Seed Company 2012 catalog, Lehi, Utah. <br />b Number of seeds per square foot shown assumes a maximum application rate of 25 pounds per acre of reclamation <br />2.1.6 Element 6: Protect Slopes <br />All cut and fill slopes shall be designed, constructed, and protected in a manner than minimizes <br />erosion. The following specific BMPs will be used to protect slopes for this project: <br />• Temporary and permanent seeding (BMP C120) <br />• Interceptor dike and Swale (BMP C200) <br />• Check dams (BMP C207) <br />Alternate slope protection BMPs shall be evaluated by the CESCL in the event the BMPs) <br />listed above are deemed ineffective or inappropriate during construction to satisfy the <br />requirements set forth in the CSGP. To avoid potential erosion and sediment control issues the <br />CESCL shall promptly initiate the repair of existing BMPs or implementation of other BMPs after <br />the first sign that existing BMPs are ineffective or failing. <br />Will steepslopes be resent at the site during construction? <br />P P 9 <br />❑ YesX No <br />2.1.7 Element 7: Protect Drain Inlets <br />All storm drain inlets and culverts made operable during construction shall be protected to <br />prevent unfiltered or untreated water from entering the drainage conveyance system. However, <br />the first priority is to keep all access roads clean of sediment and keep street wash water <br />separate from entering storm drains until treatment can be provided. Inlet Protection (BMP <br />C220) will be implemented for all drainage inlets and culverts that could potentially be impacted <br />by sediment -laden runoff on and near the project site. The following inlet protection measures <br />will be applied on this project: <br />• Inlet Protection (BMP C220) <br />If the BMP options listed above are deemed ineffective or inappropriate during construction to <br />satisfy the requirements set forth in the CSGP (Appendix E), or if no BMPs are listed above <br />but deemed necessary during construction, the CESCL shall implement one or more of the <br />alternative BMP inlet protection options listed in Appendix B. <br />