Laserfiche WebLink
1 <br />4.0 EXISTING CONDITIONS: PROPOSED CLEANUP ACTION <br />4-1 <br />4.1 <br />PHYSICAL CHARACTERISTICS <br />4-1 <br />, <br />4.2 <br />COMPLIANCE MONITORING AND CONTINGENCY PLAN OBJECTIVES <br />4-2 <br />4.2.1 Landfill Gas Compliance Monitoring and Contingency <br />Plan Objectives <br />4-2 <br />4.2.2 Groundwater Compliance Monitoring and Contingency <br />Plan Objectives <br />4-2 <br />4.2.3 Direct Contact Compliance Monitoring and Contingency <br />Plan Objectives <br />4-3 <br />4.2.4 Surface Water Compliance Monitoring and Contingency <br />Plan Objectives <br />4-3 <br />4.3 <br />INSTITUTIONAL CONTROLS <br />4-4 <br />4.4 <br />WORK TO BE PERFORMED CHECKLIST <br />4-4 <br />5.0 EXISTING CONDITIONS: CLEANUP ACTION ALTERNATIVES AND <br />JUSTIFICATION <br />5-1 <br />5.1 <br />CLEANUP ACTION ALTERNATIVES FOR GAS <br />5-2 <br />5.2 <br />JUSTIFICATION OF PROPOSED CLEANUP ACTION FOR GAS <br />5-2 <br />5.2.1 Permanent Solutions to the Maximum Extent Practicable <br />5-2 <br />5.2.2 Provide for Reasonable Restoration Time Frame <br />5-3 <br />5.2.3 Consider Public Concerns Raised during Public Comment on the Draft <br />Cleanup Action Plan <br />5-3 <br />5.3 <br />CLEANUP ACTION ALTERNATIVES FOR SURFACE WATER <br />5-3 <br />5.4 <br />JUSTIFICATION OF PROPOSED CLEANUP ACTION FOR SURFACE WATER <br />5-4 <br />5.4.1 Permanent Solutions to the Maximum Extent Practicable <br />5-4 <br />5.4.2 Provide for a reasonable restoration time frame <br />5-4 <br />5.4.3 Consider Public Concerns Raised during Public Comment on the Draft <br />Cleanup Action Plan <br />5-5 <br />6.0 FUTURE CONDITIONS: PROPOSED CLEANUP ACTIONS <br />6-1 <br />6.1 <br />PHYSICAL CHARACTERISTICS <br />6-4 <br />6.2 <br />COMPLIANCE MONITORING AND CONTINGENCY PLAN OBJECTIVES <br />6.2.1 Landfill Gas Compliance Monitoring and Contingency Plan <br />6-4 <br />Objectives <br />6-4 <br />6.2.2 Groundwater Compliance Monitoring and Contingency Plan <br />Objectives <br />6-5 <br />6.2.3 Direct Contact Compliance Monitoring and Contingency Plan <br />Objectives <br />6.2.4 Surface Water Compliance Monitoring and Contingency Plan <br />6-5 <br />Objectives <br />6-6 <br />6.3 <br />INSTITUTIONAL CONTROLS <br />6-6 <br />6.3.1 Development Management and Approvals <br />6-7 <br />6.4 <br />WORK TO BE PERFORMED CHECKLIST <br />6-8 <br />FINAL - March 2001 iv Everett Landfill Tire Fire Site <br />Cleanup Action Plan <br />Cl <br />