Laserfiche WebLink
1 <br />7.0 FUTURE CONDITIONS: CLEANUP ACTION ALTERNATIVES <br />AND <br />JUSTIFICATION <br />7-1 <br />7.1 <br />CLEANUP ACTION ALTERNATIVES FOR GAS <br />7-1 <br />7.2 <br />JUSTIFICATION OF PROPOSED CLEANUP ACTION FOR GAS <br />7-1 <br />7.2.1 Permanent Solutions to the Maximum Extent Practicable <br />7-1 <br />7.2.2 Provide for a Reasonable Restoration Time Frame <br />7-3 <br />7.2.3 Consider Public Concerns Raised during Public Comment on the Draft <br />Cleanup Action Plan <br />7-3 <br />7.3 <br />CLEANUP ACTION ALTERNATIVES FOR GROUNDWATER <br />7-3 <br />7.4 <br />JUSTIFICATION OF PROPOSED CLEANUP ACTION FOR GROUNDWATER <br />7.4.1 Permanent Solutions to the Maximum Extent Practicable <br />7-3 <br />7-3 <br />7.4.2 Provide for a Reasonable Restoration Time Frame <br />7-5 <br />7.4.3 Consider Public Concerns Raised during Public Comment on the Draft <br />Cleanup Action Plan <br />7-5 <br />7.5 <br />CLEANUP ACTION ALTERNATIVES FOR DIRECT CONTACT <br />7-5 <br />7.6 <br />JUSTIFICATION OF PROPOSED CLEANUP ACTION FOR DIRECT CONTACT <br />7-6 <br />7.6.1 Permanent Solutions to the Maximum Extent Practicable <br />7-6 <br />7.6.2 Provide for a reasonable restoration time frame <br />7.6.3 Consider Public Concerns Raised during Public Comment on the Draft <br />7-7 <br />Cleanup Action Plan <br />7-7 <br />7.7 <br />7.8 <br />CLEANUP ACTION ALTERNATIVES FOR SURFACE WATER <br />JUSTIFICATION OF PROPOSED CLEANUP ACTION FOR SURFACE WATER <br />7-7 <br />7-7 <br />7.8.1 Permanent Solutions to the Maximum Extent Practicable <br />7-7 <br />7.8.2 Provide for a reasonable restoration time frame <br />7-8 <br />7.8.3 Consider Public Concerns Raised during Public Comment on the Draft <br />Cleanup Action Plan <br />7-8 <br />7.9 <br />EXCAVATE AND REMOVE LANDFILLED MATERIALS ALTERNATIVE <br />7-9 <br />8.0 REFERENCES <br />8-1 <br />L <br />1 <br />1 <br />1 <br />n <br />1 <br />FINAL - March 2001 <br />v Everett Landfill Tire Fire Site <br />Cleanup Action Plan <br />1 <br />