Laserfiche WebLink
List of Figures <br />Figures are located at the end of the document. <br />Figure 2-1 Vicinity Map <br />Figure 2-2 Site Map <br />Figure 3-1 Landfill Gas Probes <br />Figure 3-2 Existing Groundwater Monitoring Well Network <br />Figure 3-3 Surface Water Drainage Features, Sampling Locations and Point of Compliance <br />Figure 6-1 Phased Active Landfill Gas Controls — Conceptual Cross Section <br />Figure 6-2 Phased Active Landfill Gas Controls — Conceptual Plan View <br />Figure 6-3 Diagram of Relationships between Cleanup Actions and Potential Future <br />Development <br />List of Tables <br />Tables are located at the end of the document. <br />Table 2-1 Regulatory History <br />Table 3-1 Cleanup Levels for Landfill Gas <br />Table 3-2 Groundwater Detections in the Shallow (Leachate) Aquifer and Cleanup Levels <br />Table 3-3 Groundwater Detections in the Deep Aquifer and Cleanup Levels <br />Table 6-1 Remedial Actions for Development Components <br />Table 6-2 City and Ecology Responsibilities in Potential Future Development Approvals <br />List of Attachments <br />Attachments are located at the end of the document. <br />CAP-1 Potentially Applicable or Relevant and Appropriate Requirements <br />CAP-2 Compliance Monitoring and Contingency Plan <br />FINAL - March 2001 vi Everett Landfill Tire Fire Site <br />Cleanup Action Plan <br />