Laserfiche WebLink
1 <br />The City of Everett <br />The Floyd & Snider Team Everett Landfill/Tire Fire Site <br />Table of Contents <br />1.0 Introduction <br />1-1 <br />2.0 Purpose and Objective <br />2-1 <br />2.1 OVERVIEW OF SITE CONDITIONS <br />2-1 <br />2.2 SUMMARY OF CLEANUP ACTIONS <br />2-2 <br />2.2.1 CLEANUP ACTIONS FOR EXISTING CONDITIONS <br />2-3 <br />2.2.2 CLEANUP ACTIONS FOR FUTURE CONDITIONS <br />2-3 <br />2.3 MONITORING TYPES AND OBJECTIVES <br />2-4 <br />3.0 Gas Pathway <br />3-1 <br />3.1 OBJECTIVES <br />3-1 <br />3.2 MONITORING TECHNICIAN QUALIFICATIONS <br />3-1 <br />3.3 PERIMETER SUBSURFACE LANDFILL GAS MONITORING <br />3-1 <br />3.3.1. SAMPLING PLAN <br />3-1 <br />AND INSPECTION <br />3.3.2 FREQUENCY OF SAMPLING <br />3-2 <br />3.3.3 EVALUATION METHODS <br />3-2 <br />3.3.4 REPORTING REQUIREMENTS <br />3-2 <br />3.3.5 CONTINGENCY PLAN TRIGGERS <br />3-2 <br />3.3.6 CONTINGENCY PLAN <br />3-2 <br />3.4 LANDFILL GAS MONITORING FOR EXISTING STRUCTURES <br />3-3 <br />3.4.1 ANIMAL SHELTER <br />3-3 <br />3.4.1.1 Sampling and Inspection Plan <br />Frequency <br />3-3 <br />3.4.1.2 of Sampling <br />q Y p 9 <br />3-4 <br />3.4.1.3 Evaluation Methods <br />3-4 <br />3.4.1.4 Reporting Requirements <br />3-4 <br />3.4.1.5 Contingency Plan Triggers <br />3-4 <br />3.4.1.6 Contingency Plan <br />3-4 <br />3.4.2 TRANSFER STATION <br />3-5 <br />3.4.2.1 Sampling and Inspection Plan <br />3-5 <br />3.4.2.2 Frequency of Sampling <br />3-5 <br />3.4.2.3 Evaluation Methods <br />3-5 <br />3.4.2.4 Reporting Requirements <br />3-5 <br />docs eclslCOEwMoEverettLandfiMCP maker -final Compliance Monitoring and Contingency Plan <br />docs�Compliance Monitoring Plan\CMCP 11-1 alHl.doc <br />FINAL - March 2001 <br />Page i <br />